Skip to main content
GSBiogas - HeatIndiaAMS-I.E

Installation of Household Biogas plants in various states of India

GS-3448 ↗ · current registry ID: GS11427

#151of 268 in Biogas#703of 975 in India#1178of 1801 in Gold Standard (GS)#42of 60 in AMS-I.E

4.7/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.5
Documentation
3.5

Audit Analysis

This Gold Standard household biogas project in India has a confirmed additionality assessment and a quantified 5% leakage deduction, but the verification report lists over 25 corrective actions covering ER calculation errors, inconsistent baseline values, missing sampling methodology, and data gaps across multiple states. The project delivered approximately 99.9% of its pro-rata ex-ante expectation for the monitoring period, yet the volume of MRV errors and the absence of a buffer pool, reversal data, and FPIC documentation significantly undermine confidence in the robustness of the credit claims.

Red Flags

  • The 2025 verification report lists 25+ corrective actions including ER calculation errors, inconsistent baseline values between the MR, ER sheet, and PDD, missing sample-size justification, and missing state-level data (West Bengal), indicating a fragile MRV process.
  • FPIC status is contradictory: the 2022 PDD states it was conducted, but the more recent 2025 verification report records it as not conducted; the more recent document is privileged, leaving a safeguard gap.
  • No buffer pool percentage, no reversal-event data, and no permanence claim period are stated in any available document, leaving the permanence risk for this biogas project unquantified.
  • Baseline is project-specific with no recorded reassessment date; while the 10-year VCS ALM reassessment cadence does not yet apply, the absence of any reassessment record is a transparency gap.

Credit Vintages

IssuedRetiredAvailable
2020
6206200
2021
37,97437,87797
2022
46,10145,778323
2023
45,72945,7290
2024
45,70445,7040
2025
26,47326,4730
Total202,601202,181420

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

5% quantified deduction

Baseline

Project-specific, no reassessment date

Safeguards

Grievance mechanism present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05AMS-I.E. Switch from non-renewable biomass for thermal applications by the user

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents