Skip to main content
CDMEE IndustryIndonesiaAMS-III.Q

Installation of Waste Heat Recovery Steam Boiler at Wirajaya Packindo

CDM-8545 ↗

This rating is archived — the project is no longer listed or its registry data has changed. This is the last published analysis (2026-08-11).
5.6/ 10
Integrity
7.0
Transparency
4.5
Claim Safety
6.0
Documentation
3.5

Audit Analysis

The project demonstrates solid additionality verification under the CDM framework, but overall quality is constrained by outdated documentation, a project-specific baseline, and missing monitoring data. Initial validation inconsistencies were resolved, supporting moderate claim safety despite limited recent transparency.

Red Flags

  • Missing monitoring reports and verified emission reduction figures limit current performance assessment
  • Initial validation identified inconsistencies in boiler efficiency assumptions and monitoring plan alignment
  • Low extraction confidence indicates potential data quality issues in source documents

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Industrial EE with no reversal risk

Leakage

0% deduction despite quantified justification

Baseline

Project-specific baseline, reassessment timing missing

Safeguards

No FPIC, grievance, or safeguards documentation found

Double-claim

CORSIA/CCP eligibility status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-11AMS-III.Q

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents