Skip to main content
CDMEE own generationIndiaAMS-III.Q

Drolia Energy from Waste Heat - CDM Project

CDM-5835 ↗

This rating is archived — the project is no longer listed or its registry data has changed. This is the last published analysis (2026-08-28).
4.1/ 10
Integrity
5.5
Transparency
2.8
Claim Safety
4.0
Documentation
3.5

Audit Analysis

A CDM energy-efficiency project (waste heat recovery) with a VVB-confirmed investment additionality test and a jurisdictional baseline, but severely limited post-validation data: no monitoring reports, no verified emissions reductions, and a low-confidence extraction record. The baseline classification is contradicted between the PDD and the validation report, and the 0% leakage deduction rests on a bare 'deemed negligible' assertion without supporting analysis.

Red Flags

  • Baseline method is contradictory: the PDD (Aug 2012) describes a project-specific baseline while the validation report (Oct 2012) classifies it as jurisdictional; the validation report is privileged as the later, authoritative document, but the discrepancy undermines confidence in the baseline construction.
  • No monitoring reports or verified ERR figures are present in the extracted record despite the crediting period ending in April 2022, making it impossible to confirm whether the 192,020 tCO2e claim was actually delivered.
  • Grid emission factor of 0.8399 tCO2/MWh is anchored to 2009; no updated or reassessed factor is documented, raising the risk that the baseline overstates or understates actual grid intensity.
  • Leakage deduction of 0% is justified solely as 'deemed negligible' with no quantitative analysis or scenario description in the available documents.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No buffer pool; EE project (lower risk)

Leakage

0% deduction, 'deemed negligible' only

Baseline

Contradicted between PDD and VR; 2009 grid EF

Safeguards

Mentioned; benefit sharing described; FPIC/grievance not sta

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-28AMS-III.Q.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents