Fossil Fuel switch over project activity at Ammonia-IV plant of GSFC Ltd, Vadodara, India.
Audit Analysis
A CDM fossil-fuel switch-over project at an ammonia plant in Vadodara, India, with a VVB-confirmed barrier additionality test and a measured project-specific baseline. The project is an avoidance-type activity with inherently low reversal risk, but the absence of a buffer pool, a verification report, and several key MRV data points (FNRB, usage monitoring method, verified ERR) limit confidence. The ERR figures in the PDD and monitoring report are consistent on a pro-rata basis (866 tCO₂e/yr × 2-year monitoring period ≈ 1,730; × 10-year crediting period = 8,660), and no corrective actions were required.
Red Flags
- No buffer pool percentage is stated in any available document, leaving permanence risk unquantified for a 10-year crediting period.
- Total verified ERR for the monitoring period is not found in the extracted record; only the claimed lifetime figure (8,660 tCO₂e) and the monitoring-period figure (1,730 tCO₂e) are available, preventing an independent over/under-delivery check.
- FNRB method and value, usage monitoring method, and grid emission factor are all absent from the extracted data, limiting the ability to independently verify the baseline calculation.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 1,731 | 0 | 1,731 | |
| Total | 1,731 | 0 | 1,731 |
Risk Indicators
Barrier test VVB-confirmed
No buffer pool stated
Negligible, on-site switch
Project-specific, measured
Mentioned, details sparse
CORSIA/CCP not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →