Chongqing Fufeng Cement 9MW Waste Heat Recovery for Power Generation Project

CDM-7651 ↗

#143of 617 in Industrial#394of 1181 in China#463of 1514 in CDM (UNFCCC)#1of 6 in AMS-III.Q

5.4/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.0
Documentation
6.0

Audit Analysis

A CDM waste-heat-recovery project at a cement plant with a VVB-confirmed investment additionality test and a standardised methodology (AMS-III.Q), but undermined by a grid emission factor frozen at a 2008 value, multiple material findings (meter calibration delays, unexplained project-owner change, an additional clinker line), and contradictory ERR and crediting-period figures across monitoring reports. The project is functional but carries moderate over-crediting and documentation-reliability risk.

Red Flags

  • Grid emission factor of 0.7707 tCO2/MWh is anchored to 2008 data while the monitoring period covers 2015–2017, risking systematic over-estimation of reductions as China's grid decarbonised over that interval.
  • The 2017 monitoring report records a claimed ERR of 56,857 tCO2e versus 85,013 tCO2e in the 2015 monitoring report — a 33 % drop that is not explained by a change in methodology or baseline.
  • Material findings flag meter-calibration gaps spanning roughly 14 months across two monitoring periods, a project-owner change, and an additional clinker line not reflected in the original PDD, all of which raise questions about the accuracy of the verified figures.
  • The crediting period differs between the validation report (2013-02-01 to 2023-02-01) and the 2017 monitoring report (2012-11-19 to 2022-11-18), creating ambiguity about the true project lifetime.

Credit Vintages

IssuedRetiredAvailable
2014
18,769018,769
2016
61,728061,728
2018
56,882056,882
Total137,3790137,379

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No buffer pool or reversal data stated

Leakage

0% deemed negligible, reasonable for WHR

Baseline

Project-specific baseline, 2008 grid EF

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27AMS-III.Q

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents