Skip to main content
CDMEE own generationIndiaAMS-III.Q

CCIL - Waste Gas based Electricity Generation Project

CDM-3712 ↗

This rating is archived — the project is no longer listed or its registry data has changed. This is the last published analysis (2026-08-26).
5.1/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A CDM waste-gas-to-electricity project in India with a confirmed investment-test additionality and a reputable VVB (Bureau Veritas), but undermined by 18 corrective actions at validation, a baseline-method contradiction between the PDD and monitoring report, and a 0% leakage deduction whose 'quantified' justification lacks detail. The project delivered roughly 640% of the pro-rata lifetime expectation for its first monitoring period, suggesting a very conservative initial estimate rather than over-crediting, yet the absence of a buffer pool, verified ERR figure, and safeguards documentation leaves material gaps.

Red Flags

  • 18 corrective actions were required at validation, including clarifying turbine capacity, correcting baseline data period, and adding missing monitoring parameters — indicating a weak initial PDD
  • Baseline method is stated as 'project-specific' in the monitoring report but 'jurisdictional' in the PDD, creating ambiguity about which baseline was actually applied
  • Leakage deduction is 0% with only a one-word 'quantified' justification; the material findings note steam-export leakage provisions were added, yet no quantified figure is provided
  • No buffer pool percentage is stated in any available document, leaving permanence risk unaddressed for a 10-year crediting period
  • No verified ERR figure is available — only the claimed 34,280 tCO2 for the first monitoring period, with no independent verification report to confirm actual generation

Credit Vintages

IssuedRetiredAvailable
2013
34,325034,325
Total34,325034,325

Risk Indicators

Additionality

VVB-confirmed investment test, IRR below WACC

Permanence

No buffer pool stated; EE project has lower reversal risk

Leakage

0% deduction, 'quantified' justification lacks detail

Baseline

Method contradictory across docs; grid EF from 2007

Safeguards

Safeguards mentioned but no FPIC or grievance mechanism

Double-claim

CDM project; CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS III.Q

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents