Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Turkey Registry: RegisteredAMS-I.D

Iota M. Firinci Solar Power Project

VCS-1926 ↗

#706of 1935 in Renewable energy#141of 295 in Turkey#405of 1339 in Verra (VCS)#245of 806 in AMS-I.D

5.5/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
6.0
Documentation
4.5

Audit Analysis

A registered VCS solar project in Turkey with a verified investment-test additionality and no reversal events, but undermined by ten material findings at validation (including unmet regulatory-surplus demonstration and a stakeholder-consultation gap) and multiple cross-document contradictions on baseline method, additionality test type, and safeguards. The verified ERR of 20,585 tCO₂e for the 22-month monitoring period represents roughly 129 % of the pro-rata lifetime expectation, which is within normal solar variability, but the documentation quality and internal consistency of the project record remain a concern.

Red Flags

  • Ten material findings at validation, including failure to demonstrate regulatory surplus for additionality and absence of local stakeholder consultation prior to validation
  • Contradiction between the verification report (project-specific baseline, investment test) and the monitoring report (jurisdictional baseline, combined test) on core methodological parameters
  • Crediting period in the PDD (2019-01-01 to 2028-12-31) differs from the verification report (2020-08-13 to 2030-08-12), indicating the PDD used an estimated rather than actual start date
  • Validation report cited VCS Standard v3.7 instead of the required v4.0, and the additionality tool version was inconsistent between the PDD and the validation report

Credit Vintages

IssuedRetiredAvailable
2020
4,09704,097
2021
12,135012,135
2022
11,341011,341
2023
11,432011,432
2024
1,95201,952
Total40,957040,957

Risk Indicators

Additionality

VVB-verified but with material documentation gaps

Permanence

Avoidance project, no reversal events

Leakage

Negligible, reasonable for grid-connected solar

Baseline

Project-specific, reassessment date not stated

Safeguards

FPIC and grievance present but contradicted across VR versions

Double-claim

CORSIA excluded, CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AMS I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents