Iota M. Firinci Solar Power Project
#706of 1935 in Renewable energy#141of 295 in Turkey#405of 1339 in Verra (VCS)#245of 806 in AMS-I.D
Audit Analysis
A registered VCS solar project in Turkey with a verified investment-test additionality and no reversal events, but undermined by ten material findings at validation (including unmet regulatory-surplus demonstration and a stakeholder-consultation gap) and multiple cross-document contradictions on baseline method, additionality test type, and safeguards. The verified ERR of 20,585 tCO₂e for the 22-month monitoring period represents roughly 129 % of the pro-rata lifetime expectation, which is within normal solar variability, but the documentation quality and internal consistency of the project record remain a concern.
Red Flags
- Ten material findings at validation, including failure to demonstrate regulatory surplus for additionality and absence of local stakeholder consultation prior to validation
- Contradiction between the verification report (project-specific baseline, investment test) and the monitoring report (jurisdictional baseline, combined test) on core methodological parameters
- Crediting period in the PDD (2019-01-01 to 2028-12-31) differs from the verification report (2020-08-13 to 2030-08-12), indicating the PDD used an estimated rather than actual start date
- Validation report cited VCS Standard v3.7 instead of the required v4.0, and the additionality tool version was inconsistent between the PDD and the validation report
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 4,097 | 0 | 4,097 | |
| 2021 | 12,135 | 0 | 12,135 | |
| 2022 | 11,341 | 0 | 11,341 | |
| 2023 | 11,432 | 0 | 11,432 | |
| 2024 | 1,952 | 0 | 1,952 | |
| Total | 40,957 | 0 | 40,957 |
Risk Indicators
VVB-verified but with material documentation gaps
Avoidance project, no reversal events
Negligible, reasonable for grid-connected solar
Project-specific, reassessment date not stated
FPIC and grievance present but contradicted across VR versions
CORSIA excluded, CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →