Iskur Siverek Solar Farm
#1464of 1935 in Renewable energy#35of 75 in TR#65of 154 in Intl. Carbon Registry (ICR)#1120of 1287 in ACM0002
Audit Analysis
The Iskur Siverek Solar Farm is a straightforward grid-connected solar project under ICR using the standard ACM0002 methodology with a jurisdictional baseline and a 2024 grid emission factor. However, the available record consists solely of a PDD with no independent verification report, no monitoring data, and no identified VVB, leaving the additionality claim and ERR figures unverified. The project's inherent low-risk profile (avoidance-type, no biogenic storage) mitigates permanence and leakage concerns, but the absence of third-party assurance significantly limits confidence in the credit claims.
Red Flags
- No verification report or independent VVB identified in the available record; additionality (combined test) is stated in the PDD but not independently confirmed
- Only a single document (PDD, Feb 2025) is available; no monitoring report, no verified ERR figure, and no CORSIA or CCP eligibility determination found
- Baseline reassessment timing is not stated in the available documents, leaving the currency of the jurisdictional baseline unconfirmed beyond the 2024 grid EF
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 22,706 | 0 | 22,706 | |
| 2025 | 39,656 | 0 | 39,656 | |
| 2026 | 39,656 | 0 | 39,656 | |
| 2027 | 39,656 | 0 | 39,656 | |
| 2028 | 39,656 | 0 | 39,656 | |
| 2029 | 39,656 | 0 | 39,656 | |
| 2030 | 39,656 | 0 | 39,656 | |
| 2031 | 39,656 | 0 | 39,656 | |
| 2032 | 39,656 | 0 | 39,656 | |
| 2033 | 39,656 | 0 | 39,656 | |
| 2034 | 16,948 | 0 | 16,948 | |
| Total | 396,558 | 0 | 396,558 |
Risk Indicators
Combined test in PDD, no VVB confirmation
Avoidance project, no reversal risk
0% deemed negligible, reasonable for solar
Jurisdictional, 2024 grid EF, reassessment timing unstated
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →