Ituiutaba Ceramic Fuel Switching Project
#182of 1329 in Industrial#34of 211 in Brazil#351of 1339 in Verra (VCS)#14of 60 in AMS-I.E
Audit Analysis
The Ituiutaba Ceramic Fuel Switching Project is a VCS-registered avoidance project (AMS-I.E.) that switches industrial kiln fuel to biomass. Additionality is VVB-confirmed and leakage is quantified at 5%, but the project-specific baseline, 13 closed corrective action requests, and numerous cross-document data inconsistencies temper confidence in the underlying data quality. The project delivered approximately 124% of the pro-rata emission reduction expectation for the elapsed monitoring period, suggesting no over-crediting.
Red Flags
- 13 Corrective Action Requests were raised during verification, covering baseline data consistency, biomass tonnage errors, production record revisions, and SOCIALCARBON indicator miscalculations — all closed but indicating significant data-quality issues
- FPIC status is contradictory: the 2013 validation report states no FPIC was conducted, while the 2018 monitoring report states it was — the inconsistency is unresolved in the extracted record
- Additionality test type is inconsistent across documents: the 2013 validation report records a barrier test, while the 2024 monitoring report references a combined test
- Leakage treatment changed from 'deemed negligible' (0%, 2013) to 'quantified' (5%, 2024), suggesting the earlier assessment was insufficient
- Usage monitoring method, CORSIA eligibility, and CCP status are all not stated in the available documents
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 6,327 | 6,327 | 0 | |
| 2009 | 10,255 | 10,255 | 0 | |
| 2010 | 21,472 | 21,472 | 0 | |
| 2011 | 20,744 | 20,744 | 0 | |
| 2012 | 19,133 | 19,133 | 0 | |
| 2013 | 19,813 | 19,281 | 532 | |
| 2014 | 20,897 | 15,071 | 5,826 | |
| 2015 | 9,266 | 5,276 | 3,990 | |
| 2016 | 6,646 | 0 | 6,646 | |
| 2017 | 5,912 | 0 | 5,912 | |
| 2018 | 2,142 | 2,117 | 25 | |
| 2020 | 39 | 39 | 0 | |
| 2022 | 4,278 | 0 | 4,278 | |
| 2023 | 833 | 0 | 833 | |
| Total | 147,757 | 119,715 | 28,042 |
Risk Indicators
VVB-confirmed barrier test
Avoidance project, no reversal risk
5% quantified deduction
Project-specific, reassessed 2018
Grievance mechanism present, FPIC inconsistent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →