Jbel Sendouq-Khalladi (“Khalladi”) wind farm project in Morocco (GS5073 CER to VER conversion)

GS-2053 ↗ · current registry ID: GS10309

#1324of 1935 in Renewable energy#9of 12 in Morocco#1179of 1801 in Gold Standard (GS)#1028of 1287 in ACM0002

4.7/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
5.0
Documentation
5.0

Audit Analysis

The Khalladi wind farm is a straightforward renewable-energy avoidance project with no reversal risk, but it carries significant gaps in social safeguards (no FPIC, no grievance mechanism, no benefit-sharing documentation per the most recent verification report) and a project-specific baseline built on a 2010 grid emission factor that has not been reassessed. The verified ERR for the 2014–2018 monitoring period is only about 7.6% of the pro-rata ex-ante expectation, indicating the ex-ante estimate was highly optimistic, while the verified-to-claimed ratio of roughly 58% and multiple cross-document contradictions in ERR figures and safeguards status raise data-reliability concerns.

Red Flags

  • Safeguards, grievance mechanism, and benefit-sharing are all reported as absent in the 2019 verification report, contradicting the 2018 report which stated they were present — a material gap for a Gold Standard project.
  • Verified ERR (45,712 tCO₂e) is only ~7.6% of the pro-rata ex-ante expectation (~600,000 tCO₂e) for the 4.2-year monitoring period, suggesting the ex-ante baseline was severely over-estimated.
  • Grid emission factor of 0.4862 tCO₂/MWh is from 2010 and has not been updated; if the Moroccan grid has decarbonised since then, the baseline may be overstated.
  • Additionality was confirmed at validation (2012) but the 2019 verification report records it as not re-verified by the VVB.
  • Three corrective actions remain open (geographic coordinates format, commissioning-date discrepancy, monitoring-period end-date inconsistency).

Credit Vintages

IssuedRetiredAvailable
2018
34,43934,40237
Total34,43934,40237

Risk Indicators

Additionality

Combined test confirmed at 2012 validation; not re-verified in 2019 VR

Permanence

Wind-avoidance project; no reversal events reported

Leakage

0% deduction; justification contradictory (quantified vs deemed negligible)

Baseline

Project-specific baseline; 2010 grid EF not reassessed

Safeguards

No FPIC, no grievance mechanism, no benefit-sharing per 2019 VR

Double-claim

CORSIA and CCP status not stated in any document

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05ACM0002 ver. 12.3.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.