Jilin Huaneng Zhenlai Mali Wind Power Project
Score Breakdown
Integrity
verified Additionality was confirmed by Germanischer Lloyd Certification GmbH using an investment test.
missing Leakage is not addressed, and reversal risk is also not addressed in the monitoring report.
Transparency
verified The monitoring period and VVB identity are stated in the monitoring report dated 2013-02-17.
missing Verified and claimed emission reductions are not available in the extracted record, limiting public MRV clarity.
Claim Safety
verified The project uses ACM0002 with a project baseline, which is standard for grid-connected wind power.
missing Leakage justification is listed as not addressed, and CORSIA eligibility is not stated, leaving residual over-crediting and claim-risk uncertainty.
Documentation
verified Six documents were used and the extraction confidence is medium rather than low.
missing The monitoring report lists CAR 1 through CAR 4, plus a FAR, and the crediting period conflicts with an earlier document.
Detailed Analysis
Integrity
The monitoring report dated 2013-02-17 states that additionality was confirmed by Germanischer Lloyd Certification GmbH through an investment test, which is a positive sign. The project also uses ACM0002 with a project baseline, but leakage is not addressed and reversal risk is not addressed in the extracted record, which weakens permanence and net climate benefit confidence. Multiple corrective actions were required, indicating implementation or documentation issues that reduce integrity.
Transparency
The record identifies the VVB, the monitoring period from 2011-04-26 to 2012-12-31, and the methodology version, which helps traceability. However, verified and claimed emission reduction totals are not found in the extracted record, and the usage monitoring method is also not stated. The absence of these core MRV details limits transparency.
Claim Safety
The project is a wind project under ACM0002, which generally lowers baseline manipulation risk compared with more complex sectors. Still, leakage is explicitly not addressed, and there is no stated leakage deduction, so over-crediting risk is not fully controlled. CORSIA eligibility is not stated and CCP status is only noted as not mentioned, so claim safety remains moderate rather than strong.
Documentation
Six documents were used, and extraction confidence is medium, so the record is usable but not ideal. The monitoring report lists four CARs, one CL, and one FAR, showing that the VVB found several issues requiring follow-up. Documentation quality is further weakened by the contradiction in the crediting period between the later monitoring report and the earlier document; I privileged the later monitoring report dated 2013-02-17 because it is more recent and likely reflects the updated project record.
Overall
Overall quality is moderate: the project has a VVB-confirmed additionality assessment and a standard wind methodology, but important risk controls are missing or unstated. The contradiction in the crediting period is material: one document gives 2010-07-19 to 2017-07-18, while an earlier document gives 2010-05-01 to 2017-04-30; I privileged the later monitoring report because it is more recent and should supersede the earlier schedule. Because leakage and reversal treatment are not addressed and several corrective actions were required, confidence in the claimed climate benefit is limited.
Audit Analysis
This is a wind project with a VVB-confirmed investment test and a project-specific baseline, which supports some integrity. However, leakage is not addressed, reversal risk is not addressed, and the record contains multiple corrective actions, so the quality is only moderate overall.
Project Description
Developer: Tricorona Carbon Asset Management Pte Ltd Type: Wind Size: Large scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2010-07-19 → 2017-07-18 Estimated annual credits: 116317 tCO2e SDGs: Goal 8: Decent Work and Economic Growth, Goal 7: Affordable and Clean Energy, Goal 13: Climate Action
Red Flags
- Leakage treatment is not addressed in the available monitoring record.
- Multiple corrective actions were required, and the crediting period differs across documents.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 46,669 | 0 | 46,669 | |
| 2011 | 94,375 | 0 | 94,375 | |
| 2012 | 78,741 | 0 | 78,741 | |
| Total | 219,785 | 0 | 219,785 |
Cosa migliorerebbe questo punteggio
- Provide a quantified leakage assessment and, if applicable, a documented leakage deduction with justification.
- Publish the verified and claimed emission reduction totals, and resolve the crediting-period discrepancy with a single authoritative registry record.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
reversal risk not addressed
no leakage treatment stated
project baseline, reassessment not stated
FPIC and grievance mechanism present
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti