Juruena River REDD+ Project
#86of 261 in Soil carbon#99of 211 in Brazil#719of 1339 in Verra (VCS)#13of 29 in VM0015
Audit Analysis
The Juruena River REDD+ Project has VVB-verified additionality and a 10% buffer pool, but the verification report identifies serious corrective actions including a mandatory methodology transition, monitoring non-compliance, and calculation errors affecting emission reduction quantities. The project is CORSIA-eligible with an unknown CCP status, creating dual-channel risk, and several key data fields contain contradictions between documents. Overall, the project shows moderate integrity with notable data reliability concerns.
Red Flags
- Five corrective actions required, including mandatory transition from VM0015 to VM0048 and revalidation of the baseline for 6 years
- Verification report notes 'mistakes in applying assumptions, data or calculations of emission reductions which will impact the quantity of emission reductions'
- 0.84 ha of unplanned deforestation occurred during the monitoring period
- CORSIA-eligible with CCP status not stated, creating potential dual-channel crediting risk
- Contradictions in FPIC status (true vs false) within the same verification report
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 3,524 | 0 | 3,524 | |
| 2021 | 22,202 | 0 | 22,202 | |
| Total | 25,726 | 0 | 25,726 |
Risk Indicators
VVB-confirmed investment test
10% buffer pool; 0.84 ha unplanned deforestation; reversal data contradictory
Quantified per verification report but no specific % stated; PDD shows earlier gap
Project-specific baseline; no reassessment date; methodology transition required
FPIC contradictory (true/false); grievance mechanism present; safeguards mentioned
CORSIA-eligible; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →