KALE HYDROELECTRIC POWER PLANT
#973of 1935 in Renewable energy#184of 295 in Turkey#603of 1339 in Verra (VCS)#766of 1287 in ACM0002
Audit Analysis
The Kale Hydroelectric Power Plant is a VCS-registered renewable energy project (ACM0002 v13.0) with VVB-confirmed additionality and no reversal events, but is undermined by 12 corrective action requests in the verification report, contradictory baseline method descriptions across documents, a 0% leakage deduction with inconsistent justification, and several key data fields (FNRB, buffer pool, CORSIA/CCP status) not stated in available records. The low extraction confidence and an 'unknown' document type further weaken the evidentiary base.
Red Flags
- 12 Corrective Action Requests and 2 Clarification Requests raised in the verification report, including missing actual values and broken links in the monitoring report
- Baseline method described as 'jurisdictional' in the monitoring report but 'project' in the validation report — a fundamental methodological discrepancy
- FPIC status contradicted: verification report confirms it was conducted, monitoring report states it was not
- Low extraction confidence across the document set, with one document of unknown type
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 300 | 0 | 300 | |
| Total | 300 | 0 | 300 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, justification inconsistent across docs
Jurisdictional vs project-specific contradiction
FPIC contradicted; grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →