The Kalecik Hydroelectric Power Plant is a grid-connected renewable energy project under the ICR standard with a VVB-verified combined additionality test and a reasonable 0% leakage deduction for its hydroelectric context. However, the project lacks a buffer pool, does not address reversal risk, and carries a project-specific baseline without documented reassessment timing. Multiple contradictions across documents—including a direct conflict on whether FPIC was conducted and inconsistent ERR figures—combined with low extraction confidence, limit confidence in the overall data quality.

Red Flags

  • Reversal risk is explicitly not addressed in the validation report (Section 3.8.4 discusses economic risks but ICR notes it does not cover GHG reversal), and no buffer pool is in place
  • FPIC status is directly contradicted: the PDD (Nov 2024) states FPIC was conducted, while the validation report (Jan 2025) records it as not conducted
  • Baseline method is inconsistent within the validation report itself: 'project' in the Jan 2025 version versus 'jurisdictional' in the Dec 2024 version
  • 39 Corrective Action Requests were issued during validation, indicating significant initial documentation quality issues
  • Minimum extraction confidence is rated 'low', meaning at least one key document was poorly readable

Credit Vintages

IssuedRetiredAvailable
2017
8,16808,168
2018
48,879048,879
2019
48,879048,879
2020
48,879048,879
2021
48,879048,879
2022
48,879048,879
2023
48,879048,879
2024
48,879048,879
2025
48,879048,879
2026
48,879048,879
2027
40,710040,710
Total488,7890488,789

Risk Indicators

Additionality

VVB-verified combined test

Permanence

reversal risk not addressed

Leakage

0% deduction, reasonable for grid-connected hydro

Baseline

Project-specific; reassessment timing not stated

Safeguards

Grievance mechanism present; FPIC status contradicted

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08ACM0002: Grid connected renewable electricity generation from renewable sources

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents