KAMPONG CHHNANG 60 MW SOLAR POWER PROJECT
#974of 1935 in Renewable energy#8of 18 in Cambodia#604of 1339 in Verra (VCS)#767of 1287 in ACM0002
Audit Analysis
The Kampong Chhnang 60 MW solar project is a standard renewable-energy credit under VCS methodology ACM0002 with a VVB-confirmed investment additionality test and a jurisdictional baseline. However, the verification report flags a double-claiming risk under Cambodia's NDC, extensive documentation gaps (16 corrective actions), and contradictory ERR and grid-emission-factor figures across monitoring reports, which collectively moderate confidence in the integrity and transparency of the credit.
Red Flags
- Verification report (2025-03-10) flags insufficient description of capacity consistency and a double-claiming risk under Cambodia's NDC, with a corrective action requiring explicit justification that emission reductions do not lead to double claims.
- Sixteen corrective actions were required by the VVB, including missing IRR calculation sheet, missing investment-decision-date justification, missing Single Line Diagram, and incomplete stakeholder-consultation records.
- Contradictory verified ERR figures (91,839 vs 113,194) and grid emission factors (0.5878 vs 0.7239) appear across two monitoring reports, indicating inconsistent MRV reporting.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but IRR and investment-date documentation incomplete
Renewable energy – no carbon storage, no reversal risk
Deemed negligible, standard for ACM0002 renewable project
Jurisdictional grid EF used, but last reassessment date not stated
FPIC and grievance mechanism present, but consultation details incomplete
NDC double-claiming flagged; CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →