Kangal Wind-Solar Hybrid Power Plant

GS-93 ↗ · current registry ID: GS1138

#207of 295 in Turkey#855of 1801 in Gold Standard (GS)#881of 1287 in ACM0002

5.0/ 10
Integrity
5.2
Transparency
5.0
Claim Safety
5.0
Documentation
4.5

Audit Analysis

The Kangal Wind-Solar Hybrid Power Plant is a Gold Standard-registered avoidance project with VVB-confirmed additionality and no reversal events, but it is burdened by 21 material findings, 19 corrective actions, multiple inter-document contradictions (baseline method, ERR figures, grid emission factor), a reported 23% under-delivery versus ex-ante estimates, and a mandatory transition to GS4GG that has not yet been completed. The absence of a stated buffer pool, unquantified FNRB, and the loss of the grievance logbook further erode confidence in the project's integrity and transparency.

Red Flags

  • 21 material findings and 19 corrective actions identified in the verification report, including calculation errors, data mismatches, and a lost grievance logbook
  • Actual emission reductions reported as approximately 23% lower than ex-ante estimates due to lower wind and solar output, yet the latest verification report shows claimed and verified ERR as identical (211,651 tCO2e)
  • Contradiction in baseline method between the two verification reports: 'jurisdictional' (March 2026) vs 'project-specific' (December 2025)
  • Grid emission factor discrepancy: 0.6345 (March 2026 report) vs 0.54 (December 2025 report) — a 17% difference that directly affects credit volume
  • Project registered under GS v2.2 and required to transition to GS4GG before performance certification; re-validation under GS4GG is still pending

Credit Vintages

IssuedRetiredAvailable
2020
42,69042,6900
2021
203,270202,0681,202
2022
191,12237,141153,981
2023
227,2580227,258
2024
237,9200237,920
2025
103,1940103,194
Total1,005,454281,899723,555

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, deemed negligible; minor contradiction in treatment description

Baseline

Jurisdictional per latest report but contradicted by earlier report; reassessed 2024

Safeguards

LSC and grievance mechanism present; FPIC not conducted; logbook lost

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents