The Kantur-Akdaş Landfill Methane Recovery Project presents a combined additionality test and a project-specific baseline, but the available record consists solely of the PDD with no verification report, monitoring report, or named VVB. Key integrity elements such as buffer pool, verified emissions reductions, and a robust leakage justification are absent, leaving the project's additionality and permanence claims largely unverified.
Red Flags
- No verification report or monitoring report is available; the entire evidence base is a single PDD document
- Additionality test (combined) is not confirmed by a named VVB, leaving the additionality claim unverified
- Leakage deduction of 0% is justified only as 'deemed negligible' with no quantified analysis
- No buffer pool or permanence mechanism is documented for a project with a 10-year crediting period
- No verified ERR figures exist to assess whether the project is over- or under-delivering against its 191,146 tCO₂e lifetime claim
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 11,555 | 0 | 11,555 | |
| 2020 | 7,981 | 0 | 7,981 | |
| 2021 | 16,761 | 0 | 16,761 | |
| 2022 | 17,699 | 0 | 17,699 | |
| 2023 | 18,527 | 0 | 18,527 | |
| 2024 | 19,601 | 0 | 19,601 | |
| 2025 | 19,921 | 0 | 19,921 | |
| 2026 | 20,509 | 0 | 20,509 | |
| 2027 | 21,037 | 0 | 21,037 | |
| 2028 | 21,512 | 0 | 21,512 | |
| 2029 | 16,381 | 0 | 16,381 | |
| Total | 191,484 | 0 | 191,484 |
Risk Indicators
Combined test in PDD but no VVB confirmation
Reversal N/A but no buffer pool documented
0% deduction, 'deemed negligible' only
Project-specific, no reassessment date
Grievance & benefit sharing noted; FPIC unstated
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →