Karadere Wind Power Plant

GS-175 ↗ · current registry ID: GS1303

#975of 1935 in Renewable energy#185of 295 in Turkey#618of 1801 in Gold Standard (GS)#768of 1287 in ACM0002

5.2/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

The Karadere Wind Power Plant is a Gold Standard avoidance project with VVB-confirmed additionality and smart-meter monitoring, but is undermined by a large volume of corrective actions (13 CARs, 1 FAR on bat monitoring), multiple cross-document contradictions on baseline method and leakage treatment, and an unusual situation where the verified emission reduction exceeds the claimed figure for the 2024 monitoring period. The project's inherent low-risk profile as a wind avoidance project is partially offset by data-reliability concerns and a 0% leakage deduction whose justification is inconsistent across documents.

Red Flags

  • Verified ERR (84,483 tCO2) exceeds claimed ERR (37,373 tCO2) for the 2024 monitoring period, which is highly unusual and suggests a data or methodological error
  • 13 Corrective Action Requests and 1 Forward Action Request (bat monitoring) were raised during verification, indicating significant documentation and monitoring gaps
  • Baseline method is stated as 'project-specific' in the 2025 verification report but 'jurisdictional' in the 2020 PDD — an unresolved contradiction affecting baseline credibility
  • Leakage deduction is 0% with justification described as 'quantified' in the verification report but 'deemed negligible' in the monitoring report — inconsistent treatment
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2014
15,81215,8120
2015
32,66932,6690
2016
35,67435,6740
2017
37,46637,4660
2018
40,67640,6760
2019
38,52538,5250
2020
42,08042,0800
2021
40,91929,44011,479
2022
42,11629,25912,857
2023
19,4194,50014,919
Total345,356306,10139,255

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, method contradiction with PDD

Safeguards

Grievance mechanism present, 1 FAR on bat monitoring

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents