Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Turkey Registry: RegisteredAMS-I.D

Karakurt 10.8 MW Wind Farm

VCS-66 ↗

#228of 1935 in Renewable energy#46of 295 in Turkey#97of 1339 in Verra (VCS)#81of 806 in AMS-I.D

6.3/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
7.0
Documentation
5.5

Audit Analysis

The Karakurt 10.8 MW wind farm is a relatively straightforward renewable energy project with VVB-confirmed additionality and aligned claimed/verified ERR figures. However, a contradictory leakage justification within the same 2022 verification report, a baseline method discrepancy between the 2010 and 2022 reports, 12 corrective actions related to monitoring manual gaps, and an outdated 2006 grid emission factor introduce moderate concerns about data reliability and MRV robustness.

Red Flags

  • The 2022 verification report contains an internal contradiction on leakage justification, describing it as both 'quantified' and 'deemed negligible' within the same document, undermining confidence in the 0% leakage deduction.
  • The baseline method is reported as 'jurisdictional' in the 2022 verification report but as 'project' in the 2010 verification report, creating ambiguity about the actual baseline construction.
  • Twelve corrective actions were required to strengthen the Monitoring Manual (diesel monitoring, cross-check procedures, archiving, internal audit, flow diagrams), indicating the MRV system was materially incomplete at the time of verification.
  • The grid emission factor of 0.665 tCO2/MWh is sourced from 2006 data, which is over 15 years old at the time of the 2022 verification and may not reflect current grid conditions in Turkey.

Credit Vintages

IssuedRetiredAvailable
2007
10,96010,9600
2008
20,61420,6140
2009
19,14319,1430
2010
18,33518,3350
2011
23,06119,4423,619
2012
22,853022,853
2013
20,145020,145
2014
5,50205,502
Total140,61388,49452,119

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Wind energy, no reversal risk

Leakage

0% deduction, contradictory justification

Baseline

Jurisdictional per 2022, contradicted by 2010; 2006 grid EF

Safeguards

Grievance present, FPIC not conducted

Double-claim

CORSIA excluded, CCP status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents