Kartal Wind Power Project
GS-2578 ↗ · current registry ID: GS7733
#271of 1935 in Renewable energy#57of 295 in Turkey#105of 1801 in Gold Standard (GS)#201of 1287 in ACM0002
Audit Analysis
The Kartal Wind Power Project is a Gold Standard wind project in Turkey with VVB-confirmed additionality and no reversal events, but it carries moderate risk from a project-specific baseline, a missing verified ERR figure, and a claimed emission reduction that is roughly three times the pro-rata expectation for the elapsed monitoring period. Documentation is adequate but several key verification fields remain unreported.
Red Flags
- Total verified ERR is not found in any available document, making it impossible to independently confirm the 124,496 tCO2 claimed in the monitoring report
- The claimed 124,496 tCO2 for a 6-month monitoring period is approximately 294% of the pro-rata expectation derived from the 423,015 tCO2 lifetime ex-ante estimate over a 5-year crediting period, raising a question about whether the ex-ante estimate was conservative or the monitoring period captured an unusually high-wind period
- Baseline methodology is inconsistent across documents: the validation report (Dec 2021) states a project-specific baseline while the PDD (Aug 2021) references a jurisdictional baseline
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 16,190 | 0 | 16,190 | |
| 2022 | 85,926 | 0 | 85,926 | |
| 2023 | 22,380 | 0 | 22,380 | |
| Total | 124,496 | 0 | 124,496 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversals
0% deduction, negligible for grid wind
Project-specific, grid EF from 2018
Grievance & benefit sharing present, FPIC not stated
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →