Skip to main content
ICRAvoidance / ReductionTRACM0002

KEAS Rooftop PV Bundle Project

ICR-292 ↗

#1325of 1935 in Renewable energy#22of 75 in TR#45of 154 in Intl. Carbon Registry (ICR)#1029of 1287 in ACM0002

4.7/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
5.0
Documentation
3.5

Audit Analysis

A newly registered rooftop solar PV bundle project in Turkey using a jurisdictional grid baseline and a combined additionality test. The project design is sound for its type, but the evidence base is limited to a single PDD with no independent verification report, no monitoring data, and no identified VVB, leaving key claims unverified. The absence of a buffer pool and the unconfirmed VVB verification of additionality are the principal integrity gaps.

Red Flags

  • No VVB is identified in the available record and additionality verification by an independent body is not confirmed, leaving the combined additionality test unverified by a third party.
  • Only a single document (the PDD) is available; no verification report, monitoring report, or registry listing has been extracted, making independent cross-checking impossible.

Credit Vintages

IssuedRetiredAvailable
2024
4,06904,069
2025
19,043019,043
2026
19,043019,043
2027
19,043019,043
2028
19,043019,043
2029
19,043019,043
2030
19,043019,043
2031
19,043019,043
2032
19,043019,043
2033
19,043019,043
2034
14,974014,974
Total190,4300190,430

Risk Indicators

Additionality

Combined test in PDD but VVB verification not confirmed

Permanence

Avoidance-type PV; no reversal events

Leakage

0% deduction; deemed negligible for local rooftop PV

Baseline

Jurisdictional grid EF (2020, 0.6488 tCO₂/MWh)

Safeguards

FPIC, grievance mechanism, and benefit sharing documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents