KEAS Solar Roof Bundle
#1435of 1935 in Renewable energy#28of 75 in TR#56of 154 in Intl. Carbon Registry (ICR)#1102of 1287 in ACM0002
Audit Analysis
The KEAS Solar Roof Bundle is a grid-connected solar avoidance project in Turkey using a well-established methodology (ACM0002 V22) with a jurisdictional baseline and a 2021 grid emission factor. However, the project is in its very early crediting period with no verification report, no monitoring data, and no identified VVB, leaving the additionality claim and overall integrity unconfirmed by an independent body. The low extraction confidence and a single unidentified source document further limit the reliability of the available evidence.
Red Flags
- No VVB name or verification report found in any available document — additionality (combined test) is stated in the PDD but independent confirmation is absent
- No monitoring report or verified ERR figure exists; the project cannot yet be assessed for over- or under-delivery
- Minimum extraction confidence is rated low, and one of the four referenced documents is listed as 'unknown', reducing reliability of the extracted record
- Contradiction between the PDD (benefit sharing described: yes) and the appendix (benefit sharing described: no), both dated 2024-11-20
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel or double-claiming risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 18,190 | 0 | 18,190 | |
| 2025 | 19,469 | 0 | 19,469 | |
| 2026 | 19,469 | 0 | 19,469 | |
| 2027 | 19,469 | 0 | 19,469 | |
| 2028 | 19,469 | 0 | 19,469 | |
| 2029 | 19,469 | 0 | 19,469 | |
| 2030 | 19,469 | 0 | 19,469 | |
| 2031 | 19,469 | 0 | 19,469 | |
| 2032 | 19,469 | 0 | 19,469 | |
| 2033 | 19,469 | 0 | 19,469 | |
| 2034 | 1,279 | 0 | 1,279 | |
| Total | 194,690 | 0 | 194,690 |
Risk Indicators
Combined test stated in PDD but no VVB confirmation found
Avoidance type; no reversal risk; no events reported
0% deduction; negligible for grid-connected solar
Jurisdictional grid EF (0.6345, 2021); standardised
FPIC conducted; grievance mechanism present; safeguards documented
CORSIA and CCP status both unstated; risk unassessed
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →