Kemerburgaz wind farm project
GS-881 ↗ · current registry ID: GS503
#785of 1935 in Renewable energy#158of 295 in Turkey#443of 1801 in Gold Standard (GS)#615of 1287 in ACM0002
Audit Analysis
The Kemerburgaz wind farm is a 24 MW Gold Standard project in Turkey with a barrier-based additionality test and direct grid monitoring, but the most recent verification report (2015) does not confirm additionality by the VVB, and the project carries 27 outstanding corrective actions. Emission reductions for the 2013 monitoring period (26,938 tCO2) are broadly consistent with the annual estimate (~30,133 tCO2), though a lifetime ex-ante figure of 1,027,181 tCO2 is internally inconsistent with the annual and 7-year totals. Several contradictions across documents—particularly on additionality verification, leakage treatment, and the grid emission factor—reduce confidence in the data record.
Red Flags
- Additionality verification status contradicts between the 2013 and 2015 verification reports; the more recent 2015 report does not confirm VVB verification of the barrier test
- 27 corrective actions remain outstanding, spanning meter-reading procedures, soil-test frequency, noise-study methodology, and missing PDD sections (baseline study sheet, start-date justification, operational-lifetime rationale)
- Grid emission factor of 0.5474 tCO2/MWh is drawn from 2007 data, more than 8 years before the 2015 verification, risking overstatement of reductions
- Lifetime ex-ante ERR of 1,027,181 tCO2 is roughly five times the internally consistent 7-year total of ~210,930 tCO2 (30,133 × 7), suggesting a data-extraction or reporting error
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 15,877 | 15,877 | 0 | |
| 2009 | 28,518 | 28,518 | 0 | |
| 2010 | 30,757 | 30,757 | 0 | |
| 2011 | 29,580 | 29,580 | 0 | |
| 2012 | 31,798 | 31,798 | 0 | |
| 2013 | 27,021 | 1,198 | 25,823 | |
| Total | 163,551 | 137,728 | 25,823 |
Risk Indicators
Barrier test present but VVB confirmation absent in latest report
mixed evidence / unresolved risk
0% deduction with contradictory justification across reports
Project-specific baseline, reassessed 2016, grid EF from 2007
FPIC conducted and safeguards mentioned, but grievance mechanism not stated
CORSIA and CCP status both not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →