Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Brazil Registry: RegisteredAMS-I.E

Kitambar Switching Fuel Project

VCS-33 ↗

#142of 211 in Brazil#1042of 1339 in Verra (VCS)#49of 60 in AMS-I.E

4.4/ 10
Integrity
4.2
Transparency
4.5
Claim Safety
4.5
Documentation
4.8

Audit Analysis

The Kitambar Switching Fuel Project is a long-running VCS energy-switching project in Brazil with confirmed additionality and a standardized methodology, but it carries a substantial history of data discrepancies, a VVB rotation violation, and a weak leakage justification. The 2024 verification report confirms 50,763 tCO₂e for the 2020–2022 period, yet earlier monitoring reports claimed materially different figures, and numerous corrective actions related to biomass quantities, production data, and worker conditions remain in the record. Overall, the project's credit claims are supported by a recognized methodology but are undermined by recurring data-quality issues and incomplete safeguards documentation.

Red Flags

  • VVB rotation violation: the same verification body (ESPL) performed both the first and second verification, breaching VCS Standard v4.5 Section 4.1.27(1) as noted in the material findings.
  • The 2021 monitoring report claimed 75,805 tCO₂e while the 2024 verification report verified only 50,763 tCO₂e for the 2020–2022 period, indicating a significant gap between project claims and independently verified results in at least one reporting cycle.
  • Leakage deduction of 0% is justified solely as 'deemed negligible' in the 2024 verification report, with no quantified analysis, which is a weak basis for a fuel-switching project where displaced non-renewable fuel could be redirected.
  • Extensive worker-safety and social-compliance gaps documented in material findings: no PPE compliance, no formal worker-satisfaction procedure, no waste-tracking registers, no gas/particulate emission control system, and high employee turnover with no records.
  • FPIC status is contradictory across documents: the 2016 verification report states it was not conducted, while the 2018 monitoring report states it was, leaving the true status unresolved.

Credit Vintages

IssuedRetiredAvailable
2007
40,62740,6270
2008
43,32543,3250
2009
40,78940,7890
2010
47,03947,0390
2011
47,02545,4881,537
2012
47,25147,2510
2013
47,02247,0220
2014
51,45851,4580
2015
50,13150,1310
2016
46,95546,9550
2017
25,25025,2500
2018
21,30721,207100
2019
20,18920,1890
2020
9,5585,8663,692
2021
1,0501,0500
2022
6866860
Total539,662534,3335,329

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, last reassessed 2018

Safeguards

Grievance present, FPIC contradictory, worker gaps

Double-claim

CORSIA excluded, CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AMS-I.E

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents