Kocalar Wind Power Project, Turkey

VCS-1905 ↗

#520of 1935 in Renewable energy#105of 295 in Turkey#274of 1339 in Verra (VCS)#393of 1287 in ACM0002

5.8/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
6.5
Documentation
5.0

Audit Analysis

The Kocalar Wind Power Project is a standard ACM0002 renewable energy project with a solid VVB-verified investment additionality test and no inherent permanence risk. However, the verification report lists 17 material findings—including data inconsistencies in generation records, a failure to demonstrate compliance with local and national laws, and multiple documentation gaps—that materially weaken confidence in the project's integrity and documentation quality. The project is over-delivering relative to ex-ante estimates, which is positive for claim safety, but the baseline method is inconsistently described across documents and the grid emission factor dates from 2017.

Red Flags

  • Compliance with local and national laws was not demonstrated in the verification report (material finding, corrective action required)
  • Inconsistency in June 2022 electricity generation value between the ER sheet and EPİAŞ data (CL#01) raises data-reliability concerns
  • Baseline method is described as 'project' in the 2025 verification report but 'jurisdictional' in the 2024 verification report—an unresolved contradiction
  • Grid emission factor of 0.5676 tCO₂/MWh is from 2017 and may overstate the current Turkish grid carbon intensity
  • Six corrective actions remain open, including updating the project description to VCS Standard v4.0 and demonstrating legal compliance

Credit Vintages

IssuedRetiredAvailable
2019
44,834044,834
2020
64,0932364,070
2021
62,963062,963
2022
64,932064,932
2023
63,714063,714
2024
62,784062,784
Total363,32023363,297

Risk Indicators

Additionality

VVB-verified investment test

Permanence

Not applicable – wind, no reversal risk

Leakage

0% quantified, reasonable for wind

Baseline

Method label inconsistent; 2017 grid EF

Safeguards

FPIC & grievance present but legal compliance unproven

Double-claim

CORSIA & CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents