Kocatepe Wind Power Plant, Turkey
GS-1038 ↗ · current registry ID: GS5983
#873of 1935 in Renewable energy#173of 295 in Turkey#524of 1801 in Gold Standard (GS)#686of 1287 in ACM0002
Audit Analysis
The Kocatepe Wind Power Plant is a physical wind infrastructure project with VVB-confirmed additionality and a verified ERR that matches the claimed figure for the 2024 monitoring period. However, the project is undermined by eight cross-document contradictions, three outstanding corrective action requests, a leakage treatment that the verification report describes as unaddressed, and a low extraction confidence rating that limits assurance in the underlying data.
Red Flags
- Eight contradictions across documents (leakage justification, baseline method, additionality test type, FPIC status, benefit sharing, crediting period, reversal events, ERR figures) indicate significant data reliability issues
- Three Corrective Action Requests (CARs) remain open per the verification report (2025-01-17)
- Leakage deduction of 0% is described as 'not addressed' in the verification report, while the monitoring report claims it was 'deemed negligible' — no quantified justification found
- Minimum extraction confidence rated 'low', meaning at least one key document was poorly readable, reducing assurance in all extracted figures
- Benefit sharing is described in the PDD but the monitoring report (2024-10-23) states it is not described — a concern for Gold Standard co-benefit requirements
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 86,322 | 0 | 86,322 | |
| 2021 | 125,054 | 33,793 | 91,261 | |
| Total | 211,376 | 33,793 | 177,583 |
Risk Indicators
VVB-confirmed investment test
Wind avoidance – no reversal risk
0% deduction, justification unaddressed
Project-specific, no reassessment date
FPIC and grievance present but contradicted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →