Kores Kocadag Wind Power Project, Turkey
GS-1049 ↗ · current registry ID: GS601
#49of 1935 in Renewable energy#8of 295 in Turkey#10of 1801 in Gold Standard (GS)#32of 1287 in ACM0002
Audit Analysis
The Kores Kocadag Wind Power Project is a standard Gold Standard wind project with VVB-confirmed additionality, no material findings, and monitoring results closely tracking the ex-ante expectation. The main concerns are a project-specific baseline (contradicting a jurisdictional reference in the monitoring report), reversal events that were not explicitly addressed, and the absence of CORSIA/CCP eligibility clarification. Overall, the project presents a moderate-risk profile typical of utility-scale wind in Turkey.
Red Flags
- Baseline method is stated as 'project-specific' in the 2025 verification report but 'jurisdictional' in the 2025 monitoring report — an unresolved contradiction that weakens baseline robustness
- Reversal events are listed as 'not addressed' in the verification report, and no buffer pool percentage is stated, leaving permanence risk unquantified
- CORSIA eligibility and CCP status are not stated in any available document, creating uncertainty about dual-channel crediting risk
- Lifetime ex-ante ERR differs between the PDD (276,584) and the monitoring report (324,170), a 17% gap that is not explained in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 951 | 951 | 0 | |
| 2010 | 28,551 | 28,551 | 0 | |
| 2011 | 29,010 | 29,010 | 0 | |
| 2012 | 30,339 | 30,339 | 0 | |
| 2013 | 34,392 | 34,392 | 0 | |
| 2014 | 27,899 | 27,899 | 0 | |
| 2015 | 43,593 | 43,593 | 0 | |
| 2016 | 49,315 | 49,315 | 0 | |
| 2017 | 39,572 | 39,572 | 0 | |
| 2018 | 37,992 | 37,917 | 75 | |
| 2019 | 40,631 | 40,631 | 0 | |
| 2020 | 41,533 | 31,533 | 10,000 | |
| 2021 | 45,875 | 10,000 | 35,875 | |
| 2022 | 45,034 | 44,134 | 900 | |
| 2023 | 36,609 | 43 | 36,566 | |
| 2024 | 51,331 | 0 | 51,331 | |
| Total | 582,627 | 447,880 | 134,747 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction, deemed negligible (reasonable for wind)
Project-specific baseline; method contradicts monitoring report
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →