Korkmaz Wind Farm Project, Turkey
GS-14 ↗ · current registry ID: GS1018
#707of 1935 in Renewable energy#143of 295 in Turkey#377of 1801 in Gold Standard (GS)#548of 1287 in ACM0002
Audit Analysis
The Korkmaz Wind Farm is a straightforward avoidance-type project with VVB-confirmed additionality and no reversal risk, but it is undermined by a project-specific baseline, an unaddressed leakage justification, and a very large set of material findings and corrective actions (35+) that raise concerns about the robustness of the monitoring and reporting process. The project delivered roughly 68% of its pro-rata ex-ante expectation over the first crediting period, which is conservative, though the 2024 monitoring period shows over-delivery relative to the annualised estimate, consistent with normal wind variability.
Red Flags
- 35+ corrective actions and 7 material findings in the 2024 verification report, including inconsistent ER equations, a missing wastewater avoidance calculation, and unclear single-line diagrams, indicating significant MRV quality gaps
- Leakage deduction of 0% with justification recorded as 'not addressed' in the 2024 verification report, a regression from the 2020 verification which had quantified leakage
- Baseline method recorded as project-specific in the 2024 verification report, contradicting the PDD's jurisdictional baseline, reducing baseline robustness
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 23,628 | 0 | 23,628 | |
| 2019 | 33,262 | 32,890 | 372 | |
| 2020 | 35,079 | 2,143 | 32,936 | |
| 2021 | 38,237 | 0 | 38,237 | |
| 2022 | 38,741 | 0 | 38,741 | |
| 2023 | 6,197 | 0 | 6,197 | |
| Total | 175,144 | 35,033 | 140,111 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversals
0% deduction, justification not addressed
Project-specific, reassessed 2023
Grievance & benefit sharing present, no FPIC
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →