Koru Wind Power Plant, Turkey
GS-413 ↗ · current registry ID: GS2545
#272of 1935 in Renewable energy#58of 295 in Turkey#106of 1801 in Gold Standard (GS)#202of 1287 in ACM0002
Audit Analysis
The Koru Wind Power Plant is a Gold Standard wind project with VVB-confirmed additionality, no reversal events, and a straightforward grid-displacement baseline. However, the project carries a very large volume of corrective actions (over 50 items) in its monitoring report, multiple contradictions between documents on baseline method and ER figures, and several eligibility fields (CORSIA, CCP) remain unaddressed. Overall a moderate-quality credit with inherent low-risk project type but notable documentation and consistency gaps.
Red Flags
- Over 50 corrective actions required in the monitoring report, spanning ER calculations, SDG impact reporting, sustainability parameters, and template compliance — indicating significant gaps in the submitted monitoring documentation
- Baseline method contradiction: the PDD (2020) describes a jurisdictional baseline while the verification report (2024) states a project-specific baseline, creating ambiguity about the actual baseline construction
- Multiple ERR figure contradictions across documents (e.g., verified ER of 166,237 in the 2025 verification report vs. 35,533 in the 2024 verification report; ex-ante lifetime of 671,272 vs. 581,231 in earlier PDD)
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
- FPIC was not conducted, and the verification report lists corrective actions related to stakeholder engagement and grievance mechanism documentation
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 54,924 | 54,924 | 0 | |
| 2016 | 92,609 | 84,231 | 8,378 | |
| 2017 | 89,578 | 89,388 | 190 | |
| 2018 | 92,479 | 92,479 | 0 | |
| 2019 | 96,666 | 95,292 | 1,374 | |
| 2020 | 96,424 | 54,889 | 41,535 | |
| 2021 | 91,141 | 50,872 | 40,269 | |
| 2022 | 100,014 | 195 | 99,819 | |
| 2023 | 93,999 | 0 | 93,999 | |
| Total | 807,834 | 522,270 | 285,564 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversals
0% deduction, negligible for wind
Project-specific, PDD contradiction
Present but FPIC not conducted, CARs on engagement
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →