Kozbuku HEPP

ICR-360 ↗

#708of 1935 in Renewable energy#10of 75 in TR#15of 154 in Intl. Carbon Registry (ICR)#549of 1287 in ACM0002

5.5/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.0
Documentation
6.5

Audit Analysis

Kozbükü HEPP is a small-scale hydro avoidance project in Turkey with VVB-verified additionality and no reversal events, but it carries notable integrity concerns including a 0% buffer pool, a baseline-method contradiction between the validation and verification reports, and a significant gap between claimed and verified emission reductions (the project delivered roughly 71% of the pro-rata expectation for the elapsed monitoring period). Thirty-five corrective action requests were raised and resolved, indicating a thorough but issue-laden verification process.

Red Flags

  • Verified ERR of 859,672 tCO₂e is only ~71% of the pro-rata lifetime expectation (~1,213,000 tCO₂e for the 8.6-year monitoring window), while the issuance document claims 1,221,826 tCO₂e — a 42% over-claim relative to verified figures
  • Baseline method is stated as 'project-specific' in the verification report but 'jurisdictional' in the validation report, creating ambiguity about the robustness of the counterfactual
  • Level 5 additionality claim was found to be unsupported and had to be removed during verification, and 35 CARs were raised in total, indicating substantial initial documentation weaknesses
  • Inconsistencies in grid emission factors were found between the ER sheet and the PDD/MR, undermining confidence in the quantification chain

Credit Vintages

IssuedRetiredAvailable
2016
47,331047,331
2017
142,7780142,778
2018
142,7780142,778
2019
142,7780142,778
2020
142,7780142,778
2021
142,7780142,778
2022
142,7780142,778
2023
142,7780142,778
2024
142,7780142,778
2025
142,7780142,778
2026
95,446095,446
Total1,427,77901,427,779

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

Negligible, reasonable for hydro

Baseline

Project-specific, method contradiction

Safeguards

FPIC, grievance, benefit sharing

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents