Audit Analysis
The KSAIL Bagasse Power Project is a VCS-registered renewable energy project in Kenya that displaces grid electricity using bagasse. While additionality was confirmed by the VVB and no permanence risk exists (non-AFOLU), the verification report identified 24 material findings including nine corrective action requests, and the project delivered only about 5.5% of its pro-rata ex-ante expectation for the monitored period. Safeguards documentation is contradictory and FPIC was not conducted, raising concerns about social compliance.
Red Flags
- 24 material findings in the verification report, including 9 corrective action requests covering additionality steps, baseline calculation errors, and unclear monitoring responsibilities
- Project delivered only ~5.5% of the pro-rata ex-ante expectation (7,504 tCO2 verified vs ~135,354 tCO2 expected for the 3-year monitoring period out of a 451,180 tCO2 lifetime estimate)
- FPIC was not conducted and safeguards documentation is contradictory between the validation report and verification report
- Boiler capacity discrepancy between the PDD (100 TPH) and supporting documents (90 TPH) raises questions about the accuracy of generation estimates
- No auxiliary meter for co-generation plant consumption, and meter calibration exceeded the 2-year frequency requirement
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 7,504 | 0 | 7,504 | |
| Total | 7,504 | 0 | 7,504 |
Risk Indicators
VVB-confirmed barrier test
Non-AFOLU, no reversal risk
0% deduction, contradictory justification
Project-specific, no reassessment stated
FPIC not conducted, contradictory records
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.