VCSEnergy industries (renewable/non-renewable sources)Kenya Registry: RegisteredACM0006

KSAIL Bagasse Power Project

VCS-1347 ↗

#137of 352 in Biomass#78of 157 in Kenya#864of 1339 in Verra (VCS)#23of 81 in ACM0006

4.8/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.5
Documentation
5.5

Audit Analysis

The KSAIL Bagasse Power Project is a VCS-registered renewable energy project in Kenya that displaces grid electricity using bagasse. While additionality was confirmed by the VVB and no permanence risk exists (non-AFOLU), the verification report identified 24 material findings including nine corrective action requests, and the project delivered only about 5.5% of its pro-rata ex-ante expectation for the monitored period. Safeguards documentation is contradictory and FPIC was not conducted, raising concerns about social compliance.

Red Flags

  • 24 material findings in the verification report, including 9 corrective action requests covering additionality steps, baseline calculation errors, and unclear monitoring responsibilities
  • Project delivered only ~5.5% of the pro-rata ex-ante expectation (7,504 tCO2 verified vs ~135,354 tCO2 expected for the 3-year monitoring period out of a 451,180 tCO2 lifetime estimate)
  • FPIC was not conducted and safeguards documentation is contradictory between the validation report and verification report
  • Boiler capacity discrepancy between the PDD (100 TPH) and supporting documents (90 TPH) raises questions about the accuracy of generation estimates
  • No auxiliary meter for co-generation plant consumption, and meter calibration exceeded the 2-year frequency requirement

Credit Vintages

IssuedRetiredAvailable
2015
7,50407,504
Total7,50407,504

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

Non-AFOLU, no reversal risk

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, no reassessment stated

Safeguards

FPIC not conducted, contradictory records

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09ACM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents