Kurtkayasi Wind Power Plant

GS-401 ↗ · current registry ID: GS2497

#9of 1935 in Renewable energy#3of 295 in Turkey#2of 1801 in Gold Standard (GS)#5of 1287 in ACM0002

7.2/ 10
Integrity
7.5
Transparency
6.5
Claim Safety
7.5
Documentation
7.0

Audit Analysis

The Kurtkayasi Wind Power Plant is a well-structured Gold Standard wind project with VVB-confirmed additionality, a jurisdictional grid-emission-factor baseline, and no reversal risk inherent to the avoidance-type methodology. Several inter-document contradictions (baseline method, additionality test type, leakage treatment) and a set of minor corrective actions temper the scores, but the fundamental design is sound for a renewable-energy credit. ERR delivery for the 2024 monitoring period sits at roughly 108% of the pro-rata ex-ante expectation, indicating no over-crediting concern.

Red Flags

  • Baseline method is described as 'project' in the 2022 verification report but 'jurisdictional' in the 2023 validation report — the more recent validation report is privileged, but the inconsistency raises a question about which baseline was actually applied in earlier verification cycles.
  • Additionality test type is recorded as 'combined' in the 2017 monitoring report but only 'investment' in the 2023 validation report; the narrower test in the more recent document is a mild concern.
  • The monitoring report (undated) does not address leakage, while the 2022 verification report states it was quantified — the absence of leakage discussion in the monitoring cycle is a documentation gap.
  • Six corrective actions were flagged in the verification report, including revisions to baseline GHG calculations and air-quality parameter descriptions, indicating some data-quality issues in the MRV record.

Credit Vintages

IssuedRetiredAvailable
2016
38,52538,5250
2017
36,89736,8970
2019
54,2911,08553,206
2020
71,7541,43570,319
2021
79,09849678,602
2022
15,922015,922
Total296,48778,438218,049

Risk Indicators

Additionality

VVB-confirmed combined/investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, quantified justification (grid-connected)

Baseline

Jurisdictional grid EF, but method label inconsistent across docs

Safeguards

Grievance mechanism and benefit sharing present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents