Kusakli Hydro Electric Power Plant
GS-10 ↗ · current registry ID: GS1014
#82of 295 in Turkey#165of 1801 in Gold Standard (GS)#291of 1287 in ACM0002
Audit Analysis
The Kusakli Hydro Electric Power Plant is a small run-of-river hydro project in Turkey that displaces grid electricity, with additionality confirmed by the VVB via an investment test and a reasonable 0% leakage deduction. However, a contradiction between the verification report (project-specific baseline) and the PDD (jurisdictional baseline), the absence of a buffer pool, and 24 corrective actions raised during verification introduce moderate concerns about baseline robustness and documentation quality. The project delivered approximately 85% of its pro-rata annual expectation for the 2024 monitoring period, indicating no obvious over-crediting.
Red Flags
- Baseline method contradiction: the verification report (2024) states a project-specific baseline while the PDD (2023) references a jurisdictional baseline — the basis for calculating reductions is ambiguous
- 24 corrective actions were required during verification, indicating significant documentation and methodological gaps in the PDD and monitoring procedures
- No buffer pool is in place to cover potential reversals, although reversal risk is low for an avoidance-type hydro project
- Total verified ERR is not stated in the extracted record, leaving the independently confirmed reduction figure unclear
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 5,658 | 0 | 5,658 | |
| 2020 | 15,223 | 0 | 15,223 | |
| Total | 20,881 | 0 | 20,881 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversals
0% with negligible justification
Project-specific, method contradiction
FPIC, grievance, benefit sharing
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →