Skip to main content
VCSAgriculture Forestry and Other Land UseGhana Registry: RegisteredAR-ACM0003

Kwamisa/Other reserves community Forest Project

VCS-3425 ↗

#105of 261 in Soil carbon#14of 21 in Ghana#797of 1339 in Verra (VCS)#39of 97 in AR-ACM0003

4.9/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
4.5
Documentation
4.0

Audit Analysis

The Kwamisa Community Forest Project in Ghana has a VVB-confirmed combined additionality test and a 12% buffer pool with no reported reversals, but is undermined by a project-specific baseline, a 0% leakage deduction with contradictory justifications across documents, four outstanding corrective actions, and a 63% discrepancy in the lifetime ex-ante estimate between PDD versions. The project delivered only about 18% of the pro-rata expectation for the elapsed monitoring period, and the low extraction confidence across 13 documents limits assurance on data quality.

Red Flags

  • Lifetime ex-ante estimate jumped from 1,051,223 tCO2e (PDD, Jul 2022) to 1,711,571 tCO2e (PDD, Dec 2025) — a 63% increase with no documented explanation in the extracted record
  • Leakage deduction is 0% yet the validation report calls the justification 'quantified' while the PDD calls it 'deemed negligible' — contradictory characterisations of the same treatment
  • Four corrective actions remain open, including updating the grievance redress procedure, revising the barrier analysis, and submitting FPIC and project-start-date evidence
  • The validation report flags a finding on 'investment barriers despite prior planting,' which raises a residual additionality question even though the VVB ultimately confirmed the test
  • Min extraction confidence is rated low, meaning at least one key document was poorly readable and the structured record may be incomplete

Credit Vintages Exhausted

IssuedRetiredAvailable
2023
6,4806,4800
Total6,4806,4800

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

12% buffer, no reversals

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, reassessment not yet due

Safeguards

FPIC & grievance present, CARs open

Double-claim

CORSIA & CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AR-ACM-0003

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents