La La Hydropower Project, Vietnam

GS-1218 ↗

6.0 / 10
Integrity
6.8
Transparency
5.4
Claim Safety
5.8
Documentation
5.2

Score Breakdown

Integrity

verified The verification report from Applus+ Certification confirms additionality through an investment test and reports no material findings.

missing Baseline reassessment is not stated, buffer pool coverage is not found, and reversal risk is not addressed in the extracted record.

Transparency

verified The monitoring period, crediting period, VVB name, and smart-meter usage monitoring method are stated in the verification report.

missing Total ERs claimed and verified are not stated, and key emissions inputs such as the grid emission factor are missing from the extracted record.

Claim Safety

verified The project uses a project baseline and the verification report says leakage was quantified with a leakage deduction of 0%.

missing The record contains a contradiction on leakage treatment, and no CORSIA eligibility or CCP status is confirmed, leaving residual dual-claim and over-crediting uncertainty.

Documentation

verified The record includes a recent verification report dated 2023-02-21, with six documents used and medium extraction confidence.

missing One key document was not fully readable enough to eliminate gaps, and the extracted record does not show a complete set of issuance and baseline details.

Detailed Analysis

Integrity

The verification report from Applus+ Certification confirms additionality through an investment test, and it reports no material findings or corrective actions required. The project also states a project baseline and a quantified leakage treatment with a 0% deduction, which supports the score. Confidence is reduced because buffer pool coverage is not stated, reversal events are marked as not addressed, and baseline reassessment timing is missing.

Transparency

The extracted record provides the VVB name, monitoring period, crediting period, and a smart-meter monitoring method, which helps traceability. However, total ERs claimed and verified are not stated, and the grid emission factor is missing, limiting the ability to check the emissions calculation. The absence of FNRB values and usage-rate figures also leaves important MRV details incomplete.

Claim Safety

Claim safety is helped by the VVB-confirmed additionality test and the quantified leakage treatment in the verification report. Still, the record contains a contradiction on leakage justification, with an earlier document saying leakage was not addressed and the later verification report saying it was quantified; the later verification report is privileged because it is more recent and more specific. CORSIA eligibility and CCP status are not confirmed, so dual-claim risk cannot be ruled out.

Documentation

Documentation is moderately strong because the record includes a recent verification report, six documents were used, and extraction confidence is medium rather than low. The project also has documented FPIC, a grievance mechanism, and benefit-sharing language. Even so, the evidence set is incomplete on issuance totals, baseline reassessment, and some emissions inputs, which keeps the score from being higher.

Overall

The later verification report dated 2023-02-21 was privileged over the earlier 2011/2023 conflicting entries because it is more recent and appears to be the most authoritative source in the extracted set. The contradiction on leakage treatment was resolved in favor of the later report, but it still lowers reliability because the record is inconsistent. The crediting-period contradiction was also resolved in favor of the later verification report, yet the inconsistency itself remains a documentation weakness. Because integrity is above the gate threshold, the overall score is not capped by the deterministic rule, but the missing issuance data and unresolved permanence details keep the project at a moderate level.

Audit Analysis

This is a small hydropower project with a VVB-confirmed investment-test additionality claim and no material findings reported in the verification report. However, key disclosure gaps remain around emissions accounting, baseline reassessment, and the absence of a stated buffer pool, while the record also contains a contradiction on the crediting period and leakage treatment that reduces confidence.

Project Description

Developer: Deactivated Projects Type: Small, Low - Impact Hydro Size: Small Scale Methodology: AMS-I.D. Grid connected renewable electricity generation Crediting period: 2012-04-30 → 2019-04-29 Estimated annual credits: 6905 tCO2e SDGs: Goal 13: Climate Action, Goal 9: Industry, Innovation and Infrastructure, Goal 7: Affordable and Clean Energy

Red Flags

  • The record shows a contradiction on leakage treatment: one document indicates leakage was not addressed, while the later verification report says it was quantified; the later verification report was privileged because it is more recent.
  • The crediting period is inconsistent across documents, with the later verification report showing a later period than the earlier document; the later verification report was privileged because it is more recent.
  • No buffer pool percentage is stated and reversal events are marked as not addressed, which weakens permanence confidence.
  • Total ER claims and verified issuance are not stated, limiting transparency on over-crediting risk.

Credit Vintages

Issued Retired Available
2017
1,586 0 1,586
2018
5,729 0 5,729
2019
569 0 569
Total 7,884 0 7,884

Cosa migliorerebbe questo punteggio

  • Publish verified issuance totals, claimed ER totals, and the grid emission factor used in the calculations.
  • State buffer pool coverage, reversal handling, and a clear baseline reassessment history, and reconcile the leakage and crediting-period inconsistencies in a single authoritative document.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No buffer pool stated; reversal risk not addressed

Leakage

Quantified in latest report, but earlier contradiction remai

Baseline

Project baseline stated; reassessment timing missing

Safeguards

FPIC, grievance mechanism, and benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti