Lianyuan LFG Power Generation Project
#403of 1084 in China#470of 1339 in Verra (VCS)#9of 34 in AMS-III.G
Audit Analysis
The Lianyuan LFG power generation project has a VVB-confirmed additionality assessment and consistent ERR figures (claimed equals verified at 53,799 tCO₂e for the 2022–2024 period), but the 0% leakage deduction is supported only by a 'not addressed' justification in the verification report, and three material findings in the monitoring report required corrective action. The project-specific modeled baseline and several missing parameters (FNRB method, usage monitoring, buffer pool) limit confidence in the credit's robustness.
Red Flags
- Leakage deduction of 0% with justification recorded as 'not addressed' in the verification report (2024-10-14), while the monitoring report (2024-10-12) claims it was 'deemed negligible' — the VVB's own assessment is the weaker of the two
- Three material findings in the monitoring report (missing validation date, missing SDG indicators, missing ex-ante parameters, and an inconsistency in parameter OX) triggered two corrective actions from the VVB
- FPIC status contradicts between the PDD (not conducted) and the verification report (conducted); the PDD predates the verification, but the discrepancy is unexplained
- FNRB method, usage monitoring method, and buffer pool percentage are all absent from the extracted record, leaving key MRV parameters unverified
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 32,044 | 16,168 | 15,876 | |
| 2022 | 15,825 | 0 | 15,825 | |
| Total | 47,869 | 16,168 | 31,701 |
Risk Indicators
Combined test confirmed by VVB
mixed evidence / unresolved risk
0% deduction, justification 'not addressed' per VVB
Project-specific modeled baseline, reassessment not yet due
FPIC and grievance confirmed by VVB but PDD contradicts
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →