Vai al contenuto principale
HCS Removal Documentazione completa General Methodology v2.0

LLC Agricultural Company

TC-2051 ↗

2.0 / 10
Integrity
2.4
Transparency
1.1
Claim Safety
2.0
Documentation
2.8

Score Breakdown

Integrity

verified The verification report from Control Union Malaysia reports no material findings.

missing Additionality, baseline, leakage, and permanence safeguards are not stated in the available documents.

Transparency

verified A named VVB and a defined monitoring period for 2024 are provided in the verification report dated 2025-05-16.

missing Verified and claimed ERR totals are not found, and key MRV details such as usage monitoring and baseline reassessment are missing.

Claim Safety

missing The baseline approach is not stated, which makes it difficult to judge over-crediting risk.

missing No information is provided on leakage deductions, CORSIA eligibility, or CCP status, so claim safety remains weak.

Documentation

verified The record includes a recent verification report and references two evidence documents, including validation and issuance.

missing Extraction confidence is only medium, and the available record omits many core fields needed for a robust assessment.

Detailed Analysis

Integrity

The verification report dated 2025-05-16 from Control Union Malaysia reports no material findings, which is a modest positive. However, the available record does not state the additionality test, baseline method, leakage deduction, buffer pool percentage, or any reversal history, so the project’s core integrity case cannot be verified from the extracted documents.

Transparency

Transparency is weak because the record does not provide verified or claimed ERR totals, usage monitoring method, baseline reassessment timing, or any quantified MRV outputs. The presence of a named VVB and a clear 2024 monitoring period helps, but the documentation remains too sparse for strong public accountability.

Claim Safety

Claim safety is low because the baseline method is not stated and there is no leakage treatment or quantified usage evidence in the extracted record. CORSIA eligibility and CCP status are also not stated, so there is no basis to conclude that the credits are insulated from double-claim or over-crediting concerns.

Documentation

Documentation quality is limited despite the presence of a recent verification report and references to validation and issuance documents. The extraction confidence is medium, but the record still lacks many key fields, including methodology, crediting period, safeguards, and corrective actions, which materially weakens confidence in the assessment.

Overall

The project’s score is constrained by major evidence gaps rather than explicit negative findings. There are no contradictions to resolve in the extracted record, so no document was privileged over another; instead, the assessment is driven by the absence of stated core parameters in the verification materials. Because the key integrity inputs are missing, the project cannot score well on transparency or claim safety, and the overall result remains low.

Audit Analysis

The project has very limited extractable evidence in the available verification record, with key items like baseline method, additionality test, leakage treatment, and buffer provisions not stated. The verification report shows no material findings, but the absence of core methodological details makes the crediting claim hard to assess and increases over-crediting risk.

Project Description

Credits issued: 34

Red Flags

  • Core integrity elements such as baseline method, additionality test, leakage treatment, and buffer pool are not stated in the available documents.
  • The record does not provide verified ERR totals, usage monitoring details, or eligibility status for CORSIA or CCP, leaving claim safety and transparency weak.

Credit Vintages

Issued Retired Available
2024
34 0 34
Total 34 0 34

Cosa migliorerebbe questo punteggio

  • Provide the full validation and verification package with the baseline method, additionality test, leakage assessment, buffer pool treatment, and any reversal monitoring details.
  • Disclose verified and claimed issuance figures, MRV methodology for usage monitoring, and explicit CORSIA/CCP eligibility status.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

No additionality evidence found

Permanence

No buffer or reversal detail stated

Leakage

Leakage treatment not stated

Baseline

Baseline method not stated

Safeguards

No safeguards documented

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-12 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti