Vai al contenuto principale
HCS Removal Documentazione completa General Methodology v2.0

Wandarra

TC-2047 ↗

4.8 / 10
Integrity
6.4
Transparency
3.2
Claim Safety
4.1
Documentation
4.8

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the verification report reports no material findings.

missing Baseline method, leakage treatment, and buffer pool coverage are not stated in available documents.

Transparency

verified A named verifier is identified, and the monitoring period is clearly stated as 2024-01-01 to 2024-12-31.

missing The extracted record does not state verified or claimed ERR totals, usage monitoring, or any registry completeness details.

Claim Safety

verified Third-party verification with no material findings reduces some risk of unsupported claims.

missing No baseline, leakage, or quantified issuance figures are available, so over-crediting risk cannot be well bounded.

Documentation

verified The record includes a verification report, a validation report, and issuance-related evidence, with medium extraction confidence.

missing Several core fields are missing, and the monitoring period is more recent than the absent crediting-period information.

Detailed Analysis

Integrity

The verification report from Control Union Malaysia confirms additionality was checked by the VVB, and it reports no material findings or required corrective actions. That supports the project’s integrity somewhat, but the extracted record does not state the baseline method, leakage deduction, buffer pool percentage, or any reversal history, so permanence and baseline robustness remain weakly evidenced.

Transparency

Transparency is limited because the record does identify the verifier and monitoring period, but it does not provide verified or claimed ERR totals, usage monitoring details, or registry completeness information. The extraction confidence is medium rather than high, which further limits confidence in the completeness of the public record.

Claim Safety

Claim safety is only moderate because the VVB confirmation and absence of material findings are positive, but the record lacks the core quantitative checks needed to judge over-crediting risk. In particular, no baseline method, leakage justification, or verified issuance totals are available, and CORSIA or CCP status is not stated.

Documentation

Documentation quality is mixed: there are three evidence documents referenced, including a verification report, validation report, and issuance evidence, and the extraction confidence is medium. Even so, many key fields are missing from the extracted record, including baseline, leakage, permanence, and issuance quantities, which weakens the overall documentation score.

Overall

The project has some support from third-party verification and no reported material findings, but the extracted record is missing several core elements needed for a strong quality assessment. There are no contradictions listed, so no document hierarchy decision was needed; however, the absence of quantified ERR data and baseline/leakage details keeps confidence limited. Because documentation is incomplete, transparency is low and the overall score remains moderate rather than strong.

Audit Analysis

The verification report shows third-party validation and no material findings, which supports some confidence in the project’s integrity. However, key baseline, leakage, permanence, and crediting details are not stated in the extracted record, so the evidence base is thin and claim safety is only moderate.

Project Description

Credits issued: 537

Red Flags

  • No baseline method, leakage treatment, or buffer pool information was found in the extracted documents.
  • The record does not state total verified or claimed emission reductions, limiting assessment of over-crediting risk.

Credit Vintages

Issued Retired Available
2024
537 100 437
Total 537 100 437

Cosa migliorerebbe questo punteggio

  • Publish the baseline methodology, leakage treatment, buffer pool arrangement, and any reversal monitoring details in a single accessible monitoring package.
  • Disclose verified and claimed ERR totals, plus registry and eligibility status, so over-crediting and double-claim risk can be assessed directly.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

No buffer or reversal data stated

Leakage

Leakage not addressed in extracted record

Baseline

Baseline method not stated

Safeguards

No safeguards evidence found

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-12 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti