Not registered
LMEL 25 MW Waste Heat based Captive Power Plant
- Standard
- CDM
- Methodology
- ACM0012 (CDM)
- Registry
- CDM-VNVE79B9V53 ↗ · Replaced by a new submission
- Country
- India
- Credit type
- EE own generation
The registry lists LMEL 25 MW Waste Heat based Captive Power Plant (CDM-VNVE79B9V53) as “Validation Replaced”, and this page gives no CarbonMeld rating.
Assessment
No documents to analyse yet
No CarbonMeld rating yet: the registry has not published documents for this project, so there is nothing to analyse. Registry data and credit vintages below are live from the registry. The project enters the analysis automatically as soon as its documents appear.
Standard and methodology
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Not published
This registry does not publish CORSIA eligibility per project.
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: methodology
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Issuances
No issuances recorded on the registry.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at listings@carbonmeld.com.
Profile & governance
Are you the project owner?
Full analysis (free for owners)
Owners get free access to the full analysis of their own project: every rule that raised or lowered the number, with the fact and the source it rests on, the negative facts' detail and the documents read. Write to us from your organisation's email address.
hello@carbonmeld.com →Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the rating.
hello@carbonmeld.com →Report an error on this page
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Report an error on this page →Cite this page
CarbonMeld (2026). LMEL 25 MW Waste Heat based Captive Power Plant (CDM-VNVE79B9V53): registry data. https://carbonmeld.com/projects/lmel-25-mw-waste-heat-based-captive-power-plant-cdm-vnve79b9v53/.
The citation names the registry data this page shows; the page gives no CarbonMeld rating.
Similar projects
Same methodology or sector, the same registry first.
- Bayi Steel CDQ (1#, 2#) and Waste Heat Utilization ProjectCDM-2506
- Hernics Electricity Generation from Waste Gas ProjectCDM-8956
- Fugu County Yabo 30MW Semi-coke Waste Gas Power Generation ProjectCDM-7308
- Fugu County Moyuan Magnesium & Coal Industry Co., Ltd. Semi-coke Waste Gas Power Generation ProjectCDM-7310
- Waste Heat Recovery based power generation at JK Lakshmi Cement Limited, in Sirohi, Rajasthan, IndiaCDM-10115
- Hebei Huafeng Coking Gas Recovery for Power Generation ProjectCDM-5369
- Waste heat recovery based captive power generation by Ambuja Cements, RajasthanCDM-9805
- Pingdingshan Coal (Group) Company Chaochuan Mine 6*2MW Coke Oven Gas Cogeneration ProjectCDM-2818
