Loma Fresca Methane Avoidance and Co-Composting Project
Assessment
Analysis queued
This project is in the analysis queue and has not been rated yet. Registry data, credit vintages and purchase availability below reflect the latest registry snapshot; the quality score will appear here once the analysis completes.
Standard and methodology
- Methodology
- AMS-III.Y How CarbonMeld reads projects of this type
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Not published
This registry does not publish CORSIA eligibility per project.
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: methodology
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
No issuances recorded on the registry.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
Profile & governance
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Similar projects
Same methodology or sector, the same registry first.
- Royal Dairy Solid Separation Enhanced by VermicompostingVCS-2259
- 1.25 MW biomass based captive power plant by UP Asbestos Limited at LucknowCDM-1239
- Combined Cycle at Loma de la Lata Thermo Unit ProjectCDM-7178
- Small scale Mahoba JFM A/R CDM Project on degraded lands in Mahoba Forest Division, Uttar Pradesh, IndiaCDM-10216
- Grid connected bundled wind projects in Gujarat and Tamil NaduCDM-6690
- Huadian Xinjiang Dabancheng First Phase 49.5MW Wind Power ProjectCDM-6997
- Inner Mongolia Tongliao Zhalute Qi Beishala Wind Power ProjectCDM-3608
- Son Tay Hydropower ProjectCDM-7064
