Skip to main content
VCSAgriculture Forestry and Other Land UseZambia Registry: RegisteredVM0009

Luangwa Community Forests Project

VCS-1775 ↗

#149of 261 in Soil carbon#23of 33 in Zambia#1006of 1339 in Verra (VCS)#4of 9 in VM0009

4.5/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
3.5
Documentation
5.0

Audit Analysis

The Luangwa Community Forests Project is a long-running VCS ALM project (since 2015) with confirmed additionality and a 21% buffer pool, but it is burdened by a 30% verification discount, extensive material findings, multiple methodology deviations, and a severe pro-rata under-delivery of only ~5–8% of the ex-ante lifetime expectation for the elapsed monitoring period. Data reliability is further undermined by contradictions in ERR figures and buffer pool percentages across verification reports, and the reversal-event assessment is inconsistent between the main report and its appendix.

Red Flags

  • 30% discount applied to gross verified volume because the VVB could not close PRR finding #9 (insufficient data), significantly reducing credit integrity
  • Pro-rata under-delivery: verified ERR of ~2.37 M tCO2e over 8.7 years represents only ~5.5% of the pro-rata expectation (~42.8 M tCO2e) derived from the 148 M tCO2e lifetime ex-ante estimate
  • Contradiction in total ERR claimed: 3,004,873 (2025-06-16 report) vs 2,373,847 (2025-06-18 report) — a 21% discrepancy between documents two days apart
  • Reversal-event assessment is inconsistent: the main verification report states 'none reported' while the appendix (same date) states 'not addressed'
  • SOC carbon pool excluded from multiple monitoring periods due to invalid or delayed data, reducing the comprehensiveness of the carbon accounting

Credit Vintages

IssuedRetiredAvailable
2015
444,249433,35810,891
2016
880,170805,11975,051
2017
1,089,501864,247225,254
2018
991,028820,989170,039
2019
1,355,2381,355,2380
2020
1,458,3591,458,3590
2021
1,765,0371,765,0370
2022
1,385,4141,385,4140
2023
2,468,5002,468,5000
Total11,837,49611,356,261481,235

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

21% buffer, no reversals in main doc but appendix inconsistent

Leakage

0% deduction, 'quantified' justification, no independent verification

Baseline

Project-specific baseline, reassessed 2023

Safeguards

FPIC and grievance mechanism present, but incomplete reporting noted

Double-claim

CORSIA not stated, CCP not mentioned — dual-channel risk unassessed

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09VM0009

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents