Luginy Solar Power Plant

ICR-224 ↗

#1573of 1935 in Renewable energy#8of 8 in UA#86of 154 in Intl. Carbon Registry (ICR)#536of 806 in AMS-I.D

4.0/ 10
Integrity
4.5
Transparency
2.5
Claim Safety
5.5
Documentation
3.0

Audit Analysis

The Luginy Solar Power Plant is a straightforward renewable-energy avoidance project under the ICR registry using the well-established AMS-I.D methodology, but the available record consists solely of a Project Design Document with no verification or monitoring reports. Key integrity gaps include an unaddressed permanence section (a literal placeholder in the PDD), an internal contradiction in the additionality test description, and the absence of any independent verification body. The project's claims are reasonable in magnitude for a solar installation, but they remain entirely unverified.

Red Flags

  • Permanence risk section in the PDD is an empty placeholder ('Permanence risk (%)') with no analysis, no buffer pool, and no reversal-risk mitigation described
  • Internal contradiction within the PDD: additionality test described as 'combined' in one section and 'investment' in another, with no VVB confirmation of which applies
  • No verification body identified and no monitoring or verification reports available despite the crediting period starting in November 2020
  • FPIC explicitly not conducted and no grievance mechanism described, despite safeguards being mentioned

Credit Vintages

IssuedRetiredAvailable
2020
2,31702,317
2021
14,252014,252
2022
13,552013,552
2023
13,902013,902
2024
13,902013,902
2025
13,902013,902
2026
13,902013,902
2027
13,902013,902
2028
13,902013,902
2029
13,902013,902
2030
13,902013,902
Total141,3370141,337

Risk Indicators

Additionality

Test described but contradictory and unverified

Permanence

Risk section is an empty placeholder

Leakage

0% deemed negligible — appropriate for solar

Baseline

Jurisdictional method, but no reassessment date recorded

Safeguards

Mentioned but FPIC not conducted, no grievance mechanism

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents