VCS Forestry Peru Registry: Registered Documentazione completa General Methodology v2.0

Madre De Dios Amazon REDD+ Project

VCS-844 ↗

4.4 / 10
Integrity
4.2
Transparency
6.0
Claim Safety
3.5
Documentation
4.0

Score Breakdown

Integrity

verified Additionality confirmed by the VVB (validation report, 2021-08-19).

missing Monitoring report lists multiple corrective actions including misaligned GIS areas and incomplete tables (monitoring report, 2021-08-17).

Transparency

verified Recent monitoring period reported (2020) and verification by SCS Global Services (monitoring report, validation report).

missing Key parameters absent from available extracts (grid emission factor and CPP/CORSIA status not stated).

Claim Safety

missing Contradictory ERR totals between older and newer validation reports (510,569 in 2016 vs 984,636 in 2021), increasing over‑crediting risk.

inferred Leakage is described as quantified but shows an implausible 307% deduction in the extracted record, indicating unreliable calculations (monitoring report).

Documentation

verified Large document set used (92 documents) and high extraction confidence.

missing Monitoring report required several corrective actions and contains incomplete tables and inconsistencies (monitoring report, 2021-08-17).

Detailed Analysis

Integrity

The project uses the VM0007 methodology and additionality was confirmed by the VVB in the validation report (2021-08-19), and a 10% buffer pool is present. However, the monitoring report (2021-08-17) lists many corrective actions including mismatched GIS areas and empty tables, and the baseline reassessment date is not stated. The implausible leakage deduction of 307% and contradictions in claimed emission reductions undermine confidence in baseline and leakage calculations.

Transparency

Verification was conducted by SCS Global Services and a recent monitoring period (2020) is reported, and the registry is VCS. Evidence includes a monitoring report, validation report, PDD and issuance records across 92 documents with high extraction confidence. Nevertheless, several important inputs (grid emission factor, CORSIA/CCP status, usage monitoring method) are not stated in the extracted record, reducing transparency.

Claim Safety

There is elevated risk of over‑crediting: the validation records show contradictory total emission reduction figures (510,569 reported in 2016 vs 984,636 in 2021), and the monitoring extract shows a leakage deduction of 307%, which is implausible and indicates calculation or reporting errors. CORSIA/CCP eligibility is not stated, so double‑claim risk cannot be ruled out.

Documentation

Documentation breadth is strong (92 documents, evidence from PDD, monitoring and validation reports) and extraction confidence is high. However, the monitoring report (2021-08-17) required multiple corrective actions (CAR 01/14–CAR 09/14) for missing/incorrect entries and GIS inconsistencies, lowering the documentation quality score.

Overall

I privileged the most recent verification/monitoring documents when contradictions arose: the validation report (2021-08-19) and monitoring report (2021-08-17) were treated as authoritative over older records (2013–2016) because they are later and more specific. Specifically, I used the 2021 total emission reductions (984,636) rather than the 2016 figure, and I treated recent statements that safeguards, grievance mechanisms, benefit sharing and FPIC were conducted as privileged because they appear in the 2021 monitoring report. The presence of many corrective actions and the implausible leakage figure reduced scores across integrity, claim safety and documentation. Overall score reflects moderate documentation and transparency but notable integrity and claim safety concerns.

Audit Analysis

The project has formal VVB verification, a defined buffer pool and a recent monitoring report, but significant data reliability issues and corrective actions were flagged. Contradictions in issued emission reduction figures and monitoring data gaps raise concerns about over‑crediting and calculation integrity.

Project Description

The Madre de Dios Amazon REDD Project aims to reduce the emission of greenhouse gases by preventing deforestation and forest degradation in the Amazon. With the construction of a new road system, the project was designed to counter the effects of increased agricultural and livestock activities brought on by a growing immigrant population in the region. By preventing deforestation and forest degradation, the project is able to mitigate the harmful effects of increasing greenhouse gas emissions.

Red Flags

  • Inconsistent total emission reductions reported (510,569 vs 984,636) across validation reports
  • Implausible leakage deduction of 307% in the extracted record indicating a calculation or reporting error
  • Multiple corrective action requests in the monitoring report indicating incomplete or inconsistent monitoring data

Credit Vintages

Issued Retired Available
2009
4,042,949 3,827,557 215,392
2013
774,145 772,975 1,170
2014
823,663 725,524 98,139
2015
460,382 353,727 106,655
2016
822,001 768,036 53,965
2017
1,274,532 1,248,032 26,500
2018
774,899 768,393 6,506
2019
833,007 656,629 176,378
2020
884,129 186,201 697,928
Total 10,689,707 9,307,074 1,382,633

Cosa migliorerebbe questo punteggio

  • Resolve the contradictory ERR figures by publishing a reconciled, audited issuance table and corrected monitoring calculations.
  • Correct the leakage calculation and provide transparent, line‑by‑line MRV inputs (GIS area reconciliation, grid EF, usage monitoring) and close all corrective actions reported in the monitoring report.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB‑confirmed

Permanence

buffer present, some uncertainty

Leakage

implausible deduction

Baseline

project baseline, reassessment unclear

Safeguards

mentioned but inconsistent across docs

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-22 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.