Maguary Ceramic Fuel Switching Project
#1026of 1329 in Industrial#146of 211 in Brazil#1074of 1339 in Verra (VCS)#50of 60 in AMS-I.E
Audit Analysis
The Maguary Ceramic Fuel Switching Project is a VCS-registered fuel-switching project in Brazil with a confirmed barrier additionality test and a locally measured FNRB of 0.994, but it is undermined by the absence of a buffer pool, a 0% leakage deduction that the verification report itself questions, a VVB rotation non-conformity, and nine cross-document contradictions. The project delivered roughly 59% of its pro-rata ex-ante expectation for the 2012–2018 monitoring window, which is conservative, yet the volume of material findings and corrective actions signals significant MRV and governance weaknesses.
Red Flags
- VVB rotation requirement (VCS Standard v4, Sec 4.1.20) was not met, as flagged in the 2024 verification report
- Leakage deduction of 0% justified as 'deemed negligible' while the same verification report lists a material finding on lack of clarity regarding non-renewable biomass leakage and absence of an ex-post survey
- Inconsistency in verified emission reductions between the verification report and monitoring report (41,302 vs 41,602 tCO2e) noted as a material finding
- Nine contradictions across documents on safeguards, FPIC, grievance mechanism, benefit sharing, leakage justification, FNRB method, additionality test type, and ERR figures
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 2,052 | 44 | 2,008 | |
| 2009 | 11,667 | 11,667 | 0 | |
| 2010 | 11,403 | 4,345 | 7,058 | |
| 2011 | 8,758 | 0 | 8,758 | |
| 2012 | 9,545 | 0 | 9,545 | |
| 2013 | 5,513 | 0 | 5,513 | |
| 2014 | 5,951 | 0 | 5,951 | |
| 2015 | 8,279 | 0 | 8,279 | |
| 2016 | 6,101 | 0 | 6,101 | |
| 2017 | 6,914 | 0 | 6,914 | |
| 2018 | 895 | 0 | 895 | |
| Total | 77,078 | 16,056 | 61,022 |
Risk Indicators
VVB-confirmed barrier test
no reversal events confirmed
0% deduction, 'deemed negligible' questioned by VVB
Project-specific baseline; reassessment timing not stated
Conflicting records; FPIC and grievance mechanism disputed
CORSIA-ineligible; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →