Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the verification report reports no material findings or corrective actions.
missing Reversal treatment is inconsistent across documents, and the verification report does not address reversal events.
Transparency
verified The project has a named verifier, a defined monitoring period, and an annual survey-based usage monitoring approach.
missing Total claimed versus verified emission reductions are not stated in the extracted record, and the monitoring evidence is affected by document contradictions.
Claim Safety
verified The verification report uses a local field approach for the non-renewable biomass fraction, with a value of 0.76 rather than a generic default.
missing The project is marked CORSIA-eligible, which increases dual-claim scrutiny, while leakage is only described as negligible without a quantified deduction.
Documentation
verified Multiple document types were used, including the PDD, verification report, monitoring report, and stakeholder consultation materials.
missing One key document was extracted with only medium confidence, and the record contains several contradictions on baseline, crediting period, and reversal treatment.
Detailed Analysis
Integrity
The verification report confirms additionality through the VVB and reports no material findings or corrective actions, which supports the core project case. At the same time, the report says reversal events were not addressed, and the extracted record shows a contradiction with the monitoring report, which weakens permanence confidence. Leakage is only described as deemed negligible, with no quantified deduction in the available record, so the integrity score is held to a moderate level.
Transparency
The project has a named verifier, a clear monitoring period, and an annual survey-based usage monitoring method, which helps transparency. However, total claimed and verified emission reductions are not stated in the extracted record, limiting public comparability. The monitoring evidence is also less clean because the extracted record contains contradictions on the usage monitoring method and other core fields.
Claim Safety
Claim safety is helped by the VVB-confirmed additionality and the use of a local field method for the non-renewable biomass fraction, with a reported value of 0.76. Still, the project is marked CORSIA-eligible, which raises dual-claim scrutiny, and the record does not show a CCP status. Leakage is not quantified and is only said to be negligible, so over-crediting risk is not fully resolved.
Documentation
The record draws on several document types, including the PDD, verification report, monitoring report, and stakeholder consultation materials, which is a positive sign. Even so, one key document was extracted with medium confidence rather than high, and the record contains contradictions on the baseline approach, crediting period, usage monitoring method, and reversal treatment. Those inconsistencies reduce confidence in the completeness and reliability of the documentation set.
Overall
I privileged the verification report for the additionality finding, the local-field non-renewable biomass method, and the later crediting-period dates because it is the more recent assurance document, while noting that the PDD provides conflicting earlier values. I also privileged the monitoring report for the reported reversal issue, which directly conflicts with the verification report’s statement that reversal events were not addressed; this contradiction materially lowers reliability. Because the project is CORSIA-eligible and leakage is only qualitatively treated, the overall risk profile remains moderate rather than strong.
Audit Analysis
The project has some positive quality signals, including VVB-confirmed additionality, no material findings, and documented safeguards such as FPIC and a grievance mechanism. However, there are reliability concerns around contradictory source records, an unaddressed reversal issue in the verification report, and limited visibility into leakage and baseline reassessment details.
Project Description
Developer: OFFGRIDSUN S.R.L. Type: Energy Efficiency - Domestic Size: Small Scale Crediting period: 2023-09-20 → 2028-09-19 Estimated annual credits: 14315 tCO2e SDGs: Goal 7: Affordable and Clean Energy, Goal 13: Climate Action, Goal 15: Life On Land, Goal 3: Good Health and Well-Being, Goal 6: Clean Water and Sanitation, Goal 5: Gender Equality, Goal 8: Decent Work and Economic Growth
Red Flags
- The verification report says reversal events were not addressed, while a later monitoring report says they were reported, creating a material consistency issue.
- Leakage treatment is only described as deemed negligible, with no quantified deduction or detailed justification in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 416 | 0 | 416 | |
| 2024 | 4,568 | 0 | 4,568 | |
| 2025 | 3,312 | 0 | 3,312 | |
| Total | 8,296 | 0 | 8,296 |
Cosa migliorerebbe questo punteggio
- Provide a quantified leakage assessment and, if applicable, a documented leakage deduction with methodology support.
- Resolve the contradictions between the verification report and monitoring report on reversal events, usage monitoring, and crediting period, and publish a clear reconciliation note.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
reversal issue not cleanly resolved
negligible claim without quantified deduction
project baseline with timing inconsistency
FPIC and grievance mechanism documented
CORSIA-eligible status increases dual-claim scrutiny
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →