Makres Solar Power Plant

ICR-203 ↗

#1441of 1935 in Renewable energy#33of 75 in TR#61of 154 in Intl. Carbon Registry (ICR)#471of 806 in AMS-I.D

4.5/ 10
Integrity
5.0
Transparency
4.0
Claim Safety
5.0
Documentation
3.0

Audit Analysis

The Makres Solar Power Plant is a straightforward grid-displacement solar project in Turkey with VVB-confirmed additionality and no reversal risk, but it is undermined by an extensive list of material findings (28+), 21 corrective actions, six cross-document contradictions on key parameters, and a complete absence of monitoring or verified emission-reduction data. The low extraction confidence and a 'tempered' PDD template further erode confidence in the underlying record.

Red Flags

  • 28+ material findings and 21 corrective actions identified by the VVB, including contradictory emission factors and incorrect baseline emission calculations in the PDD (CAR-12)
  • No monitoring report or verified emission-reduction figure is available in the extracted record, making it impossible to confirm that claimed reductions are being delivered
  • FPIC status is contradictory: the PDD states it was conducted, but the validation report (the higher-authority document) records it as not conducted
  • The PDD template was flagged as 'tempered' by the VVB, raising concerns about the integrity of the project documentation
  • Grid emission factor discrepancy between the PDD (0.7424) and the validation report (0.6488, 2022) affects the magnitude of claimed reductions

Credit Vintages

IssuedRetiredAvailable
2017
3410341
2018
6,24106,241
2019
6,24106,241
2020
6,24106,241
2021
6,24106,241
2022
6,24106,241
2023
6,24106,241
2024
6,24106,241
2025
6,24106,241
2026
6,24106,241
2027
5,41905,419
Total61,929061,929

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversals

Leakage

Negligible, justified for solar

Baseline

Project-specific, no reassessment date

Safeguards

Grievance present, FPIC contradictory

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08AMS-I.D: “Grid connected renewable electricity generation”

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents