Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Argentina Registry: RegisteredACM0002

Manantiales Behr Wind Farm

VCS-1820 ↗

#33of 1935 in Renewable energy#1of 18 in Argentina#9of 1339 in Verra (VCS)#21of 1287 in ACM0002

7.0/ 10
Integrity
7.2
Transparency
7.0
Claim Safety
7.3
Documentation
6.2

Audit Analysis

The Manantiales Behr Wind Farm is a standard VCS renewable energy project with VVB-confirmed additionality, a jurisdictional grid baseline, and full verification of claimed emissions reductions for the 2022 monitoring period. The project carries low inherent risk as a wind farm displacing grid electricity, though a single material finding on billing meter configuration and several inter-document inconsistencies temper confidence. CORSIA and CCP eligibility are not stated, leaving dual-channel risk unassessed.

Red Flags

  • Six contradictions across documents, including a shift in baseline method from 'project' (validation report, 2019) to 'jurisdictional' (monitoring report, 2023) and a change in additionality test type from 'investment' to 'combined' between monitoring reports
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel crediting risk unassessed
  • FPIC status is not documented in the extracted record, and the grid emission factor (0.509 tCO₂/MWh) is anchored to 2015 data, which is now eight years old relative to the 2023 verification

Credit Vintages

IssuedRetiredAvailable
2018
71,67644,57827,098
2019
268,062107,122160,940
2020
261,960128,382133,578
2021
259,333204,30455,029
2022
261,41522,363239,052
Total1,122,446506,749615,697

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Wind energy – no reversal risk

Leakage

0% deduction, grid-delivered output

Baseline

Jurisdictional EF, 2015 anchor; method label inconsistent across docs

Safeguards

Grievance mechanism present; FPIC not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents