Methane Recovery and Biogas Utilization Project, Lao Cai Province, Vietnam

GS-2878 ↗ · current registry ID: GS10889

#218of 352 in Biomass#74of 80 in Vietnam#1526of 1801 in Gold Standard (GS)

4.2/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
4.0
Documentation
3.5

Audit Analysis

This Gold Standard methane recovery and biogas cogeneration project in Vietnam has a VVB-verified investment additionality test and a measured project-specific baseline, but is undermined by six material calculation findings, 28 corrective actions, a contradictory leakage justification, and the absence of a buffer pool. The project over-delivers relative to its pro-rata ex-ante expectation (135% for the elapsed monitoring year), which is reassuring, yet the volume of unresolved calculation errors and documentation gaps significantly erodes confidence in the reported credit figures.

Red Flags

  • Six material findings in the 2025 verification report include incorrect calculations of biogas energy (BEww,discharge,y), missing project-emission calculations from fossil fuel consumption, and inconsistent ex-ante parameter values between the monitoring report and ER sheet — all of which cast doubt on the reliability of the 34,611 tCO2e figure.
  • Leakage is deducted at 0%: the PDD (2020) states it was 'deemed negligible' while the 2025 verification report records it as 'not addressed,' leaving no quantified or justified treatment for a project type where displaced biogas or methane re-release is plausible.
  • Twenty-eight corrective actions were required by the VVB, spanning missing ex-ante and ex-post parameters, inconsistent crediting-period dates, incorrect GWP values, and absent safeguarding-principle monitoring — indicating systemic documentation and calculation weaknesses.
  • Free, Prior and Informed Consent (FPIC) was not conducted, despite the project operating in a provincial community in Vietnam and claiming benefit-sharing.

Credit Vintages

IssuedRetiredAvailable
2021
33,69032,0711,619
2022
33,35731,7351,622
2023
33,1886,88426,304
2024
15,579015,579
Total115,81470,69045,124

Risk Indicators

Additionality

VVB-verified investment test, but PDD/validation report discrepancy on test type

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction; PDD says 'negligible' but verification report says 'not addressed'

Baseline

Project-specific, measured, last reassessed 2023; PDD/monitoring report conflict on measured vs modeled

Safeguards

Grievance mechanism and benefit sharing present, but FPIC not conducted; safeguarding monitoring gaps flagged

Double-claim

CORSIA eligibility and CCP status both not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents