Skip to main content
GSBiomass, or Liquid Biofuel - CogenerationViet NamGeneral Methodologyv2.1

Methane Recovery and Biogas Utilization Project, Yen Bai Province, Vietnam

GS-2877 ↗ · current registry ID: GS10888

#139of 352 in Biomass#59of 80 in Vietnam#1085of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
4.8
Documentation
4.5

Audit Analysis

This Gold Standard methane recovery and biogas cogeneration project in Vietnam has VVB-confirmed additionality and a measured baseline, but is undermined by a 0% leakage deduction with no justification, the absence of any buffer pool, eight material findings, and eleven outstanding corrective actions. Multiple internal contradictions in ERR figures, grid emission factors, and crediting periods across documents raise data-reliability concerns. The project delivered roughly 79% of the pro-rata ex-ante expectation for the monitored period, suggesting modest under-delivery rather than over-crediting.

Red Flags

  • 0% leakage deduction with justification recorded as 'not addressed' in the 2025 verification report, despite the 2021 report having previously quantified leakage
  • Eleven corrective actions remain open, including inconsistencies in ex-ante parameters (nCOD, EFFFb, DCH4, GWP) across the MR, PDD, and ER sheet
  • Two different lifetime ex-ante ERR values (155,524 and 331,067) appear in the same PDD dated 2020-10-14, an unresolved internal contradiction
  • Additionality test type differs between the 2020 PDD (combined) and the 2023 validation report (investment), creating ambiguity about the actual test applied

Credit Vintages

IssuedRetiredAvailable
2021
22,73621,6031,133
2022
29,70728,2211,486
2023
20,58219,5541,028
2024
11,178011,178
Total84,20369,37814,825

Risk Indicators

Additionality

VVB-confirmed investment test (2023 validation report)

Permanence

no reversal data; inherent risk in methane recovery

Leakage

0% deduction, justification 'not addressed' in 2025 VR

Baseline

Project-specific, measured, reassessed 2023; internal PDD contradiction

Safeguards

Grievance mechanism and benefit sharing present; FPIC not stated; CARs on SP 3 & 8.1

Double-claim

CORSIA and CCP status both not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents