Skip to main content
GSWindTurkeyACM0002

Metristepe Wind Farm Project, Turkey

GS-52 ↗ · current registry ID: GS1067

#230of 1935 in Renewable energy#48of 295 in Turkey#83of 1801 in Gold Standard (GS)#165of 1287 in ACM0002

6.3/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
7.0
Documentation
5.5

Audit Analysis

The Metristepe Wind Farm is a straightforward renewable-energy avoidance project with VVB-confirmed additionality, no reversal risk, and a conservative ex-ante estimate that the project is exceeding. However, a project-specific baseline, a low extraction confidence rating, 15 corrective actions in the monitoring report, and several inter-document contradictions (notably on baseline method and additionality status) temper confidence in the overall data quality.

Red Flags

  • Low extraction confidence indicates at least one key document was poorly readable, reducing reliability of extracted facts
  • 15 corrective actions required in the 2025 monitoring report, including incorrect crediting-period dates, wrong PDD version, and a rounding error in the annual emission reduction value
  • Additionality verification status contradicts between the 2022 verification report (not confirmed) and the 2025 verification report (confirmed), raising questions about the robustness of the additionality assessment over time
  • Baseline method is described as 'project-specific' in the 2025 verification report but 'jurisdictional' in the 2025 monitoring report, creating ambiguity about the actual baseline approach
  • FPIC was not conducted, and benefit-sharing is described inconsistently across verification reports (present in 2020, absent in 2022)

Credit Vintages

IssuedRetiredAvailable
2012
42,78142,7810
2013
66,84826,88239,966
2014
56,27852,3413,937
2015
57,56957,5690
2016
60,42560,4250
2017
58,43929,28829,151
2018
57,9431,15856,785
2019
13,99530913,686
2020
34,79513,82220,973
2021
58,963058,963
2022
59,114059,114
2023
52,634052,634
2024
48,551048,551
Total668,335284,575383,760

Risk Indicators

Additionality

Combined test, VVB-confirmed (2025)

Permanence

Wind avoidance, no reversal risk

Leakage

0% deduction, quantified justification

Baseline

Project-specific, not jurisdictional

Safeguards

Grievance mechanism present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents